Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

MEM20005 Mapping and Delivery Guide
Install and maintain door control devices/systems

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency MEM20005 - Install and maintain door control devices/systems
Description
Employability Skills
Learning Outcomes and Application This unit of competency defines the skills and knowledge required to select, install, fault find and adjust a range of door control devices and door control systems. It applies to work conducted in commercial, industrial and domestic environments. No licensing, legislative or certification requirements apply to this unit at the time of publication. Band: AUnit Weight: 2
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Locksmithing
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Determine job requirements
  • Follow standard operating procedures (SOPs)
       
Element: Comply with work health and safety (WHS) requirements at all times
       
Element: Select and use appropriate personal protective equipment (PPE) in accordance with SOPs
       
Element: Identify job requirements from specifications, drawings, job sheets or work instructions
       
Element: Review work order and clarify with appropriate person(s), as required
       
Element: Prepare for installation and service
  • Select appropriate tools, equipment and materials to meet job requirements and check for operational effectiveness in accordance with manufacturers' specification
       
Element: Identify faulty or unsafe tools and segregate for repair or replacement in accordance with SOPs
       
Element: Identify potential and existing risks and hazards associated with maintenance activities and control in accordance procedures and SOPs
       
Element: Install door control devices/ systems
  • Select the appropriate door control device/systems for the given door type and specifications
       
Element: Install door control devices/systems in accordance with manufacturers' specifications, work order and legislative requirements and SOPs
       
Element: Check door control devices/systems for correct operation and adjust, as necessary
       
Element: Service door control device
  • Conduct checks on door control devices/systems and components to identify any damage, friction or sticking in accordance with manufacturers' specifications
       
Element: Assess viability for continued operation or replacement of door control device
       
Element: Adjust door control devices/systems and/or components in accordance with manufacturers' specifications, work order and legislative requirements and SOPs
       
Element: Complete installation or service
  • Make notification of work completion to appropriate person(s) in accordance with SOPs
       
Element: Complete documentation and process in a prompt and accurate manner in accordance with SOPs
       
Element: Clean work area, tools and equipment and store in accordance with SOPs
       
Element: Report malfunctions, faults, wear or damage to tools for repair or replacement
       
Element: Collect waste from service and repair activities, treat and dispose or recycle in accordance with organisational and environmental requirements
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

This field allows for different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included.

PPE includes one (1) or more of the following:

face shields, goggles and safety glasses

hearing protection

dust masks and respirators

high visibility vests or clothing

head protection

sun protection, hats and sun screen

gloves and knee pads

safety footwear

witches hats

warning signs and warning tapes

temporary safety barriers

fire extinguisher

first aid kit

Work order includes one (1) or more of the following:

work schedules, completion dates, job requirements and tasks

specific client requirements

access to site and specific site requirements

resource requirements

WHS requirements and compliance with relevant legislation

budget allocations and warranties

service information

Appropriate person(s) includes one (1) or more of the following:

installer

subcontractor

technician

supervisor

manager/director

client

Materials include one (1) or more of the following:

solder

insulation tape

screws, springs, split pins and masonry fasteners

graphite powder and lockease

oil, silicon, dry lube and grease

adhesives

paint, patch materials

electronic components

cleaning compounds

key blanks

Tools and equipment include one (1) or more of the following:

hand tools

fixing tools

strippers

router

file

drill and power saw

spirit level

soldering iron and welder

ladder and hoist

drop sheet

batteries

masterkey plans

PPE

communications equipment

Safe operating practices include one (1) or more of the following:

working safely around electrical wiring, cables and overhead power lines

working safely around tools and equipment

hazard recognition, emergency procedures

awareness of electrical hazards

following confined spaces procedures

administering first aid

Risks and hazards include one (1) or more of the following:

non-compliance with building codes and regulations

exposed electrical wiring

manual handling

exposure to asbestos, dust, noise, live power, vermin, water, glass fibre, building debris, natural and other gas build-up

Maintenance includes one (1) or more of the following:

cleaning

inspection

lubrication

routine repairs

identification of worn parts

confirming operation

adjustments

key cutting

replacement of worn parts

Door control devices/systems include one (1) or more of the following:

surface mounted door closers

semi concealed door closers

concealed closers

semi-automatic/automatic door control devices

exit devices

Documentation includes one (1) or more of the following:

completion of work log

mechanical lock/locking system problems/faults

warranty conditions and allowances

recommendation for repairs

operational checks and maintenance conducted

testing and commissioning results

parts and components replaced

materials used

masterkey plans:

code matrix

key and door schedules

recommendations for future operation and maintenance

costings

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Follow standard operating procedures (SOPs) 
 
 
 
 
Select appropriate tools, equipment and materials to meet job requirements and check for operational effectiveness in accordance with manufacturers' specification 
 
 
Select the appropriate door control device/systems for the given door type and specifications 
 
 
Conduct checks on door control devices/systems and components to identify any damage, friction or sticking in accordance with manufacturers' specifications 
 
 
Make notification of work completion to appropriate person(s) in accordance with SOPs 
 
 
 
 

Forms

Assessment Cover Sheet

MEM20005 - Install and maintain door control devices/systems
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MEM20005 - Install and maintain door control devices/systems

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: