Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

MEM20029 Mapping and Delivery Guide
Develop and implement a master key system

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency MEM20029 - Develop and implement a master key system
Description
Employability Skills
Learning Outcomes and Application
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Determine job requirements
  • Follow standard operating procedures (SOPs)
  • Comply with work health and safety (WHS) requirements at all times
  • Select and use personal protective equipment (PPE) in accordance with SOPs
  • Identify job requirements from specifications
       
Element: Assess customer requirements
  • Consider physical characteristics of existing locks and other security devices and determine requirement for additional site inspection
  • Discuss customer access and task requirements and clarify in accordance with SOPs
  • Interpret architectural plans, floor plans and charts when planning and preparing a master key system in line with scope of job requirements
  • Evaluate customer requirements with respect to current capacity, and make recommendations for the design of new or expanded system
  • Identify personal limitations in assessing requirements for master key system and seek assistance from appropriate personnel in accordance with SOPs
       
Element: Design master key system and system modifications
  • Design commercial master key system to meet customer complex access requirements
  • Check system for interchange based on specifications
  • Apply principles and processes of master keying in accordance with industry practice and organisational requirements
       
Element: Finalise system design
  • Review final system design and keying requirements and confirm with appropriate personnel in accordance with organisational requirements
  • Prepare documentation to allow for future interpretation and design requirements
  • Prepare documentation, and process and store in accordance with client, legislative requirements and SOPs
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Follow standard operating procedures (SOPs) 
Comply with work health and safety (WHS) requirements at all times 
Select and use personal protective equipment (PPE) in accordance with SOPs 
Identify job requirements from specifications 
Consider physical characteristics of existing locks and other security devices and determine requirement for additional site inspection 
Discuss customer access and task requirements and clarify in accordance with SOPs 
Interpret architectural plans, floor plans and charts when planning and preparing a master key system in line with scope of job requirements 
Evaluate customer requirements with respect to current capacity, and make recommendations for the design of new or expanded system 
Identify personal limitations in assessing requirements for master key system and seek assistance from appropriate personnel in accordance with SOPs 
Design commercial master key system to meet customer complex access requirements 
Check system for interchange based on specifications 
Apply principles and processes of master keying in accordance with industry practice and organisational requirements 
Review final system design and keying requirements and confirm with appropriate personnel in accordance with organisational requirements 
Prepare documentation to allow for future interpretation and design requirements 
Prepare documentation, and process and store in accordance with client, legislative requirements and SOPs 

Forms

Assessment Cover Sheet

MEM20029 - Develop and implement a master key system
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MEM20029 - Develop and implement a master key system

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: