Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

MEM234034 Mapping and Delivery Guide
Manage heating, ventilation, air conditioning and refrigeration systems or projects

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency MEM234034 - Manage heating, ventilation, air conditioning and refrigeration systems or projects
Description
Employability Skills
Learning Outcomes and Application
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Identify scope of HVACR system work requirements
  • Review HVACR system drawings, manufacturer manuals and other technical data for system specifications
  • Determine HVACR system performance requirements
  • Determine if any commissioning or modification actions are required to ensure performance requirements are met
  • Determine relevant regulatory requirements
  • Inspect site and any existing HVACR equipment to confirm or determine suitability, availability of other services and control requirements
  • Produce or review HVACR system management schedule including any required installation, commissioning, and modification or maintenance requirements
  • Integrate building management systems (BMS) considerations into the schedule based on work requirements
       
Element: Brief team on HVACR system work requirements
  • Distribute and discuss drawings, schedules, and major materials and equipment with team
  • Arrange for required request for further information (RFIs) with designers
  • Brief team on key compliance and risk factors, including regulatory, work health and safety (WHS) and environmental requirements
  • Agree with team on critical control points and reporting requirements
       
Element: Commence installation, commissioning, modification or maintenance tasks
  • Supervise any equipment shutdowns required for task
  • Confirm availability of equipment components and materials for scheduled tasks.
  • Check and determine that supply of services to work are adequate for task commencement
  • Ensure all tradespersons have correct drawings
       
Element: Monitor progress and deal with contingencies
  • Establish procedures to ensure work is completed to design specifications
  • Ensure electrical and HVACR control systems and circuits are consistent with specifications and regulations
  • Identify problems and contingencies and establish and rectify root cause
       
Element: Finalise HVACR system work requirements
  • Conduct final check to ensure completed work is consistent with drawings, manufacturer manuals and any regulatory requirements
  • Conduct test run of equipment and system
  • Identify and correct any malfunctions or errors in required output.
       
Element: Conduct handover and finalise documentation
  • Brief client and operators on machine or equipment operation after completion of work
  • Prepare and submit required reports in accordance with organisational procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Review HVACR system drawings, manufacturer manuals and other technical data for system specifications 
Determine HVACR system performance requirements 
Determine if any commissioning or modification actions are required to ensure performance requirements are met 
Determine relevant regulatory requirements 
Inspect site and any existing HVACR equipment to confirm or determine suitability, availability of other services and control requirements 
Produce or review HVACR system management schedule including any required installation, commissioning, and modification or maintenance requirements 
Integrate building management systems (BMS) considerations into the schedule based on work requirements 
Distribute and discuss drawings, schedules, and major materials and equipment with team 
Arrange for required request for further information (RFIs) with designers 
Brief team on key compliance and risk factors, including regulatory, work health and safety (WHS) and environmental requirements 
Agree with team on critical control points and reporting requirements 
Supervise any equipment shutdowns required for task 
Confirm availability of equipment components and materials for scheduled tasks. 
Check and determine that supply of services to work are adequate for task commencement 
Ensure all tradespersons have correct drawings 
Establish procedures to ensure work is completed to design specifications 
Ensure electrical and HVACR control systems and circuits are consistent with specifications and regulations 
Identify problems and contingencies and establish and rectify root cause 
Conduct final check to ensure completed work is consistent with drawings, manufacturer manuals and any regulatory requirements 
Conduct test run of equipment and system 
Identify and correct any malfunctions or errors in required output. 
Brief client and operators on machine or equipment operation after completion of work 
Prepare and submit required reports in accordance with organisational procedures 

Forms

Assessment Cover Sheet

MEM234034 - Manage heating, ventilation, air conditioning and refrigeration systems or projects
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MEM234034 - Manage heating, ventilation, air conditioning and refrigeration systems or projects

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: