Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

MEM234037 Mapping and Delivery Guide
Perform maintenance-related integrated logistic support management activities

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency MEM234037 - Perform maintenance-related integrated logistic support management activities
Description
Employability Skills
Learning Outcomes and Application
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Assist to develop and maintain logistic support analysis plans
  • Draft accurate and complete technical content for logistic support analysis plans
  • Review the technical content of logistic support analysis plans in line with trends in system supportability and affordability and with changes in the design baseline
  • Propose revisions to logistic support analysis plans
       
Element: Perform life cycle cost analysis
  • Identify actual and anticipated costs through to life of type
  • Analyse cost data and extract key information for ILS activities
       
Element: Establish and maintain baselines for reliability, availability and maintainability
  • Gather data on in-service reliability, availability and maintainability (RAM) and establish baselines
  • Review data against established baselines and initiate action to deal with deviations from established baselines
       
Element: Develop and maintain a maintenance plan and identify associated requirements
  • Perform a level of repair analysis (LORA)
  • Specify maintenance activities and timelines
  • Identify and document support and test equipment requirements
  • Identify and document skills and maintenance manpower requirements
  • Identify and document requirements for maintenance facilities
  • Identify and document technical documentation requirements
  • Provide data for initial spares assessment
  • Revise the maintenance plan and applicable associated requirements required by baseline changes
       
Element: Revise technical logistic support analysis record data
  • Analyse logistic support analysis parameters using current data
  • Enter analysis results in the logistic support analysis record
  • Develop and manage a technical data management system in accordance with contractual and regulatory requirements
  • Monitor the relevance of technical data and initiate amendment action where necessary
  • Apply and support logistic support management information systems
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Draft accurate and complete technical content for logistic support analysis plans 
Review the technical content of logistic support analysis plans in line with trends in system supportability and affordability and with changes in the design baseline 
Propose revisions to logistic support analysis plans 
Identify actual and anticipated costs through to life of type 
Analyse cost data and extract key information for ILS activities 
Gather data on in-service reliability, availability and maintainability (RAM) and establish baselines 
Review data against established baselines and initiate action to deal with deviations from established baselines 
Perform a level of repair analysis (LORA) 
Specify maintenance activities and timelines 
Identify and document support and test equipment requirements 
Identify and document skills and maintenance manpower requirements 
Identify and document requirements for maintenance facilities 
Identify and document technical documentation requirements 
Provide data for initial spares assessment 
Revise the maintenance plan and applicable associated requirements required by baseline changes 
Analyse logistic support analysis parameters using current data 
Enter analysis results in the logistic support analysis record 
Develop and manage a technical data management system in accordance with contractual and regulatory requirements 
Monitor the relevance of technical data and initiate amendment action where necessary 
Apply and support logistic support management information systems 

Forms

Assessment Cover Sheet

MEM234037 - Perform maintenance-related integrated logistic support management activities
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MEM234037 - Perform maintenance-related integrated logistic support management activities

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: