Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

MSFFL2044 Mapping and Delivery Guide
Install mouldings and edge trims to timber flooring

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency MSFFL2044 - Install mouldings and edge trims to timber flooring
Description
Employability Skills
Learning Outcomes and Application This unit describes the skills and knowledge required to prepare, set out, cut and fix timber or metal mouldings and trims to timber and engineered flooring after installation, replacement, sanding and finishing.This unit applies to flooring technicians installing mouldings and edge trims in accordance with pre-determined work orders.Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking flooring work. Industry standards and codes of practice within Australia must also be applied. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare for work
  • Identify and follow work health and safety, legislative and organisational requirements
  • Correctly identify work requirements and process from review of documentation
  • Confirm floor suitablity for installation consistent with Australian Standards, industry standards and manufacturer recommendations
  • Select adhesives, mouldings, trims and fixings based on job requirements
  • Select and check tools, equipment and materials prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
  • Plan sequence of work, including the starting point, to ensure efficiency and quality of installation
       
Element: Set out materials for installation
  • Acclimatise mouldings and trims in accordance with manufacturer recommendations
  • Organise mouldings, trims and materials in accordance with safety management requirements
  • Establish working lines and starting point.
       
Element: Cut mouldings and trims
  • Follow instructions and sequence for cutting and fixing
  • Lay out mouldings and trims to meet directional sequence, pattern match, specification requirements and to minimise waste and joins
  • Maximise the aesthetics of the materials, where appropriate, matching grains and colours
  • Accurately and clearly mark moulding and trim materials for cutting
  • Cut moulding and trim to length and size for final fixing ensuring minimum waste
       
Element: Fix mouldings/trims
  • Prepare adhesives, mechanical fixings and accessories for use in accordance with manufacturer instructions
  • Use fixing methods and equipment in accordance with manufacturer recommendations
  • Fit skirting boards and/or mouldings to perimeter walls allowing for expansion joints
  • Fit and/or re-fit cover trims and edge strips to expansion joints and transitions of the timber flooring
  • Inspect finished job and rectify any imperfections in accordance with workplace procedures
       
Element: Complete housekeeping
  • Store and recycle unused materials in accordance with workplace procedures
  • Check, clean and store tools and equipment in accordance with workplace procedures
  • Clean work area and dispose of rubbish safely
  • Accurately complete required workplace documentation
  • Identify and follow work health and safety, legislative and organisational requirements
  • Correctly identify work requirements and process from review of documentation
  • Confirm floor suitablity for installation consistent with Australian Standards, industry standards and manufacturer recommendations
  • Select adhesives, mouldings, trims and fixings based on job requirements
  • Select and check tools, equipment and materials prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
  • Plan sequence of work, including the starting point, to ensure efficiency and quality of installation
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Identify and follow work health and safety, legislative and organisational requirements 
Correctly identify work requirements and process from review of documentation 
Confirm floor suitablity for installation consistent with Australian Standards, industry standards and manufacturer recommendations 
Select adhesives, mouldings, trims and fixings based on job requirements 
Select and check tools, equipment and materials prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition 
Plan sequence of work, including the starting point, to ensure efficiency and quality of installation 
Acclimatise mouldings and trims in accordance with manufacturer recommendations 
Organise mouldings, trims and materials in accordance with safety management requirements 
Establish working lines and starting point. 
Follow instructions and sequence for cutting and fixing 
Lay out mouldings and trims to meet directional sequence, pattern match, specification requirements and to minimise waste and joins 
Maximise the aesthetics of the materials, where appropriate, matching grains and colours 
Accurately and clearly mark moulding and trim materials for cutting 
Cut moulding and trim to length and size for final fixing ensuring minimum waste 
Prepare adhesives, mechanical fixings and accessories for use in accordance with manufacturer instructions 
Use fixing methods and equipment in accordance with manufacturer recommendations 
Fit skirting boards and/or mouldings to perimeter walls allowing for expansion joints 
Fit and/or re-fit cover trims and edge strips to expansion joints and transitions of the timber flooring 
Inspect finished job and rectify any imperfections in accordance with workplace procedures 
Store and recycle unused materials in accordance with workplace procedures 
Check, clean and store tools and equipment in accordance with workplace procedures 
Clean work area and dispose of rubbish safely 
Accurately complete required workplace documentation 
Identify and follow work health and safety, legislative and organisational requirements 
Correctly identify work requirements and process from review of documentation 
Confirm floor suitablity for installation consistent with Australian Standards, industry standards and manufacturer recommendations 
Select adhesives, mouldings, trims and fixings based on job requirements 
Select and check tools, equipment and materials prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition 
Plan sequence of work, including the starting point, to ensure efficiency and quality of installation 

Forms

Assessment Cover Sheet

MSFFL2044 - Install mouldings and edge trims to timber flooring
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MSFFL2044 - Install mouldings and edge trims to timber flooring

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: