Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

MSFFL3067 Mapping and Delivery Guide
Complete large scale and complex vinyl flooring installations

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency MSFFL3067 - Complete large scale and complex vinyl flooring installations
Description
Employability Skills
Learning Outcomes and Application This unit describes the skills and knowledge required to prepare, cut, weld, layout and fix resilient floor covering to large and potentially complex areas such as stairs, stringers and steps.This unit applies to flooring technicians installing resilient flooring in accordance with pre-determined work orders.Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking flooring work. Industry standards and codes of practice within Australia must also be applied. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare for installation
  • Identify and follow work health and safety, legislative and organisational requirements
  • Confirm subfloor suitability for installation consistent with Australian Standards and manufacturer recommendations
  • Measure areas and calculate the required amount of floor covering
  • Check required underlay or underlayment against specified type and fitting or application requirements
  • Select adhesives, trims and accessories based on job requirements
  • Select and check tools, equipment and materials for suitability, serviceability and safety prior to use
  • Plan sequence of work, including the starting point, to ensure efficiency and quality of installation
  • Check resilient floor coverings against work order and acclimatise in accordance with manufacturer recommendations
       
Element: Set out materials
  • Organise and use resilient floor coverings for fixing in accordance with safety management requirements
  • Establish working lines and starting point
  • Cut and fit any required pre-form fillet in accordance with specifications
       
Element: Lay resilient floor coverings
  • Follow instructions and sequence for laying and fixing
  • Lay out resilient floor coverings to meet directional sequence, pattern match and specifications, minimising waste and joins
  • Cut patterns and use to accurately and clearly mark resilient floor covering for cutting
  • Cut resilient floor coverings to required pattern and shape with minimum waste of materials
  • Select seam and join welding and fixing methods, equipment and materials and use in accordance with safety requirements and manufacturer instructions
  • Set out and install resilient skirting, reducer and edge strips in accordance with job requirements
  • Check completed installation for flaws in installation and materials and rectify faults following workplace procedures
       
Element: Complete housekeeping
  • Store and recycle unused materials in accordance with workplace procedures
  • Check, clean and store tools and equipment in accordance with workplace procedures
  • Clean work area and dispose of rubbish safely
  • Accurately complete required workplace documentation
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Identify and follow work health and safety, legislative and organisational requirements 
Confirm subfloor suitability for installation consistent with Australian Standards and manufacturer recommendations 
Measure areas and calculate the required amount of floor covering 
Check required underlay or underlayment against specified type and fitting or application requirements 
Select adhesives, trims and accessories based on job requirements 
Select and check tools, equipment and materials for suitability, serviceability and safety prior to use 
Plan sequence of work, including the starting point, to ensure efficiency and quality of installation 
Check resilient floor coverings against work order and acclimatise in accordance with manufacturer recommendations 
Organise and use resilient floor coverings for fixing in accordance with safety management requirements 
Establish working lines and starting point 
Cut and fit any required pre-form fillet in accordance with specifications 
Follow instructions and sequence for laying and fixing 
Lay out resilient floor coverings to meet directional sequence, pattern match and specifications, minimising waste and joins 
Cut patterns and use to accurately and clearly mark resilient floor covering for cutting 
Cut resilient floor coverings to required pattern and shape with minimum waste of materials 
Select seam and join welding and fixing methods, equipment and materials and use in accordance with safety requirements and manufacturer instructions 
Set out and install resilient skirting, reducer and edge strips in accordance with job requirements 
Check completed installation for flaws in installation and materials and rectify faults following workplace procedures 
Store and recycle unused materials in accordance with workplace procedures 
Check, clean and store tools and equipment in accordance with workplace procedures 
Clean work area and dispose of rubbish safely 
Accurately complete required workplace documentation 

Forms

Assessment Cover Sheet

MSFFL3067 - Complete large scale and complex vinyl flooring installations
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MSFFL3067 - Complete large scale and complex vinyl flooring installations

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: