Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

MSFFL3068 Mapping and Delivery Guide
Install resilient floor coverings using custom designs and decorative finishes

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency MSFFL3068 - Install resilient floor coverings using custom designs and decorative finishes
Description
Employability Skills
Learning Outcomes and Application This unit describes the skills and knowledge required to prepare, set out lay and fix resilient sheet floor coverings using custom designs, mechanically and hand cut motifs, logos and decorative finishes.This unit applies to flooring technicians installing resilient flooring in accordance with pre-determined work orders.Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking flooring work. Industry standards and codes of practice within Australia must also be applied. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare for installation
  • Identify and follow work health and safety, legislative and organisational requirements
  • Read documentation and identify work requirements
  • Confirm subfloor suitability for installation consistent with Australian Standards and manufacturer recommendations
  • Select adhesives, trims and accessories based on job requirements
  • Select and check tools, equipment and materials prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
  • Plan sequence of work, including the starting point, to ensure efficiency and quality of installation
  • Check resilient floor coverings against work order and acclimatise in accordance with manufacturer recommendations.
       
Element: Set out materials
  • Identify and follow instructions and sequence for laying and fixing
  • Organise and use resilient floor coverings for fixing in accordance with safety management requirements
  • Establish working lines and starting point and accurately mark on the subfloor
  • Set out and mark motifs, logos or custom designs on the subfloor in accordance with design
       
Element: Lay resilient floor covering
  • Lay out resilient floor coverings to meet directional sequence, pattern match and specification requirements, minimising waste and joins
  • Accurately and clearly mark resilient flooring materials for cutting
  • Cut resilient floor coverings to required shape ensuring minimum waste
  • Organise materials for fixing and use in accordance with relevant safety management requirements
  • Prepare adhesives and edge strips and/or accessories for use in accordance with manufacturer instructions
  • Use welding, fixing methods and equipment in accordance with manufacturer instructions
  • Inspect finished job and rectify any imperfections following workplace procedures
       
Element: Complete housekeeping
  • Store and recycle unused materials in accordance with workplace procedures
  • Check, clean and store tools and equipment in accordance with workplace procedures
  • Clean work area and dispose of rubbish safely
  • Accurately complete required workplace documentation
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Identify and follow work health and safety, legislative and organisational requirements 
Read documentation and identify work requirements 
Confirm subfloor suitability for installation consistent with Australian Standards and manufacturer recommendations 
Select adhesives, trims and accessories based on job requirements 
Select and check tools, equipment and materials prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition 
Plan sequence of work, including the starting point, to ensure efficiency and quality of installation 
Check resilient floor coverings against work order and acclimatise in accordance with manufacturer recommendations. 
Identify and follow instructions and sequence for laying and fixing 
Organise and use resilient floor coverings for fixing in accordance with safety management requirements 
Establish working lines and starting point and accurately mark on the subfloor 
Set out and mark motifs, logos or custom designs on the subfloor in accordance with design 
Lay out resilient floor coverings to meet directional sequence, pattern match and specification requirements, minimising waste and joins 
Accurately and clearly mark resilient flooring materials for cutting 
Cut resilient floor coverings to required shape ensuring minimum waste 
Organise materials for fixing and use in accordance with relevant safety management requirements 
Prepare adhesives and edge strips and/or accessories for use in accordance with manufacturer instructions 
Use welding, fixing methods and equipment in accordance with manufacturer instructions 
Inspect finished job and rectify any imperfections following workplace procedures 
Store and recycle unused materials in accordance with workplace procedures 
Check, clean and store tools and equipment in accordance with workplace procedures 
Clean work area and dispose of rubbish safely 
Accurately complete required workplace documentation 

Forms

Assessment Cover Sheet

MSFFL3068 - Install resilient floor coverings using custom designs and decorative finishes
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MSFFL3068 - Install resilient floor coverings using custom designs and decorative finishes

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: