Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

MSFFL3081 Mapping and Delivery Guide
Install block parquetry flooring

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency MSFFL3081 - Install block parquetry flooring
Description
Employability Skills
Learning Outcomes and Application This unit describes the skills and knowledge required to prepare, set out, cut and install block parquetry flooring in domestic and commercial sites. It includes patterned parquetry.This unit applies to flooring technicians working in accordance with pre-determined work orders.Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking flooring work. Industry standards and codes of practice within Australia must also be applied. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare for work
  • Identify and follow work health and safety, legislative and organisational requirements
  • Correctly identify work requirements and process from review of documentation
  • Confirm subfloor condition as suitable for installation consistent with Australian Standards and manufacturer recommendations
  • Select and check tools, equipment and materials prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
  • Remove or undercut skirting boards or cover trims if required and store for re-fitting in accordance with work requirements
  • Plan sequence of work, including the position of each expansion joint, to ensure efficiency and quality of installation
       
Element: Set out block parquetry flooring
  • Inspect timber flooring material and check against work orders, ensuring the species, grade, size and quantity are correct
  • Moisture check timber using required equipment and confirm suitability of moisture content for site conditions as per pre-site inspection procedures
  • Organise and use block parquetry flooring for fixing in accordance with safety management requirements
  • Prepare required adhesives and edge strips in accordance with manufacturer instructions
  • Accurately measure area to be covered, and establish working lines and starting point
       
Element: Lay out and cut parquetry blocks
  • Follow instructions and sequence for laying and fixing
  • Lay appropriate underlay in accordance with manufacturer recommendations
  • Lay out block parquetry flooring to meet directional sequence, pattern match, specification requirements, and to minimise waste and joins
  • Maximise the aesthetics of the materials, including matching grains and colours
  • Accurately and clearly mark parquetry blocks for cutting
  • Cut parquetry blocks, to provide appropriate size and shape ensuring minimum waste
       
Element: Install block parquetry
  • Use required adhesives and edge strips/accessories in accordance with manufacturer instructions
  • Use fixing methods and equipment following manufacturer recommendations
  • Install and fix parquetry to produce required pattern
  • Allow for appropriate field and perimeter expansion joints
  • Fit and/or re-fit and finish skirting boards or cover trims
  • Inspect finished job and rectify any imperfections following workplace procedures
       
Element: Complete housekeeping
  • Store and recycle unused materials in accordance with workplace procedures
  • Check, clean and store tools and equipment in accordance with workplace procedures
  • Clean work area and dispose of rubbish safely
  • Accurately complete required workplace documentation
  • Identify and follow work health and safety, legislative and organisational requirements
  • Correctly identify work requirements and process from review of documentation
  • Confirm subfloor condition as suitable for installation consistent with Australian Standards and manufacturer recommendations
  • Select and check tools, equipment and materials prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
  • Remove or undercut skirting boards or cover trims if required and store for re-fitting in accordance with work requirements
  • Plan sequence of work, including the position of each expansion joint, to ensure efficiency and quality of installation
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Identify and follow work health and safety, legislative and organisational requirements 
Correctly identify work requirements and process from review of documentation 
Confirm subfloor condition as suitable for installation consistent with Australian Standards and manufacturer recommendations 
Select and check tools, equipment and materials prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition 
Remove or undercut skirting boards or cover trims if required and store for re-fitting in accordance with work requirements 
Plan sequence of work, including the position of each expansion joint, to ensure efficiency and quality of installation 
Inspect timber flooring material and check against work orders, ensuring the species, grade, size and quantity are correct 
Moisture check timber using required equipment and confirm suitability of moisture content for site conditions as per pre-site inspection procedures 
Organise and use block parquetry flooring for fixing in accordance with safety management requirements 
Prepare required adhesives and edge strips in accordance with manufacturer instructions 
Accurately measure area to be covered, and establish working lines and starting point 
Follow instructions and sequence for laying and fixing 
Lay appropriate underlay in accordance with manufacturer recommendations 
Lay out block parquetry flooring to meet directional sequence, pattern match, specification requirements, and to minimise waste and joins 
Maximise the aesthetics of the materials, including matching grains and colours 
Accurately and clearly mark parquetry blocks for cutting 
Cut parquetry blocks, to provide appropriate size and shape ensuring minimum waste 
Use required adhesives and edge strips/accessories in accordance with manufacturer instructions 
Use fixing methods and equipment following manufacturer recommendations 
Install and fix parquetry to produce required pattern 
Allow for appropriate field and perimeter expansion joints 
Fit and/or re-fit and finish skirting boards or cover trims 
Inspect finished job and rectify any imperfections following workplace procedures 
Store and recycle unused materials in accordance with workplace procedures 
Check, clean and store tools and equipment in accordance with workplace procedures 
Clean work area and dispose of rubbish safely 
Accurately complete required workplace documentation 
Identify and follow work health and safety, legislative and organisational requirements 
Correctly identify work requirements and process from review of documentation 
Confirm subfloor condition as suitable for installation consistent with Australian Standards and manufacturer recommendations 
Select and check tools, equipment and materials prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition 
Remove or undercut skirting boards or cover trims if required and store for re-fitting in accordance with work requirements 
Plan sequence of work, including the position of each expansion joint, to ensure efficiency and quality of installation 

Forms

Assessment Cover Sheet

MSFFL3081 - Install block parquetry flooring
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MSFFL3081 - Install block parquetry flooring

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: