Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
MSFFL3105 Mapping and Delivery Guide Install laminate and hybrid vinyl flooring
Version 1.0 Issue Date: May 2024
Qualification
-
Unit of Competency
MSFFL3105 - Install laminate and hybrid vinyl flooring
Description
Employability Skills
Learning Outcomes and Application
Duration and Setting
X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners
Student Learning Resources
Handouts Activities
Slides PPT
Assessment 1
Assessment 2
Assessment 3
Assessment 4
Elements of Competency
Performance Criteria
Element: Prepare to install laminate and hybrid vinyl flooring
Read and interpret laminate and hybrid vinyl flooring installation requirements from job and manufacturer instructions and calculate the quantities of materials required
Identify hazards relating to the work site, work practices, materials, tools and equipment, and check risk treatments are in place and operating
Select and check all required tools and equipment are ready to use, and organise to fix any deficiencies according to workplace procedures
Gather the flooring, underlay, adhesives, trims and other materials required by job instructions, and check they meet quality requirements and are prepared and ready to install according to manufacturer instructions, product labels and safety data sheets
Confirm the subfloor is clean and suitable for installing the flooring, and fix or report any deficiencies according to workplace procedures
Remove or undercut door jambs, cover trims and other joinery, and store for refitting or send for machining according to job instructions
Element: Cut, fit and fasten the laminate and hybrid vinyl flooring
Install appropriate underlay if required according to manufacturer instructions
Establish the starting point and mark out working lines
Lay out the flooring pieces according to job instructions to maximise aesthetics with respect to material colours, grains and patterns and to minimise waste and joins, and to ensure an efficient, quality installation
Measure, mark and cut the flooring pieces to length and size
Install the flooring according to the manufacturer instructions, allowing appropriate field and perimeter expansion joints
Trim off excess, install finishing strips, refit removed items and finish installing the flooring to meet quality requirements
Check the flooring is installed correctly according to job instructions and quality requirements, and fix any deficiencies
Element: Complete the task according to workplace procedures
Clean up the work area, identify items for recycling and dispose of waste
Identify, tag and report any damage to equipment and tools
Check, clean and do routine maintenance on equipment and tools and store them and unused materials
Complete task outcome documentation
Submission Requirements
List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here
Assessment task 1: [title] Due date:
(add new lines for each of the assessment tasks)
Assessment Tasks
Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.
Observation Checklist
Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice
Yes
No
Comments/feedback
Read and interpret laminate and hybrid vinyl flooring installation requirements from job and manufacturer instructions and calculate the quantities of materials required
Identify hazards relating to the work site, work practices, materials, tools and equipment, and check risk treatments are in place and operating
Select and check all required tools and equipment are ready to use, and organise to fix any deficiencies according to workplace procedures
Gather the flooring, underlay, adhesives, trims and other materials required by job instructions, and check they meet quality requirements and are prepared and ready to install according to manufacturer instructions, product labels and safety data sheets
Confirm the subfloor is clean and suitable for installing the flooring, and fix or report any deficiencies according to workplace procedures
Remove or undercut door jambs, cover trims and other joinery, and store for refitting or send for machining according to job instructions
Install appropriate underlay if required according to manufacturer instructions
Establish the starting point and mark out working lines
Lay out the flooring pieces according to job instructions to maximise aesthetics with respect to material colours, grains and patterns and to minimise waste and joins, and to ensure an efficient, quality installation
Measure, mark and cut the flooring pieces to length and size
Install the flooring according to the manufacturer instructions, allowing appropriate field and perimeter expansion joints
Trim off excess, install finishing strips, refit removed items and finish installing the flooring to meet quality requirements
Check the flooring is installed correctly according to job instructions and quality requirements, and fix any deficiencies
Clean up the work area, identify items for recycling and dispose of waste
Identify, tag and report any damage to equipment and tools
Check, clean and do routine maintenance on equipment and tools and store them and unused materials
Complete task outcome documentation
Forms
Assessment Cover Sheet
MSFFL3105 - Install laminate and hybrid vinyl flooring
Assessment task 1: [title]
Student name:
Student ID:
I declare that the assessment tasks submitted for this unit are my own work.
Student signature:
Result: Competent Not yet competent
Feedback to student
Assessor name:
Signature:
Date:
Assessment Record Sheet
MSFFL3105 - Install laminate and hybrid vinyl flooring
Student name:
Student ID:
Assessment task 1: [title] Result: Competent Not yet competent
(add lines for each task)
Feedback to student:
Overall assessment result: Competent Not yet competent