MSFFL3116 - Install resilient sheet to walls Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
MSFFL3116 Mapping and Delivery Guide Install resilient sheet to walls
Version 1.0 Issue Date: May 2024
Qualification
-
Unit of Competency
MSFFL3116 - Install resilient sheet to walls
Description
Employability Skills
Learning Outcomes and Application
Duration and Setting
X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners
Student Learning Resources
Handouts Activities
Slides PPT
Assessment 1
Assessment 2
Assessment 3
Assessment 4
Elements of Competency
Performance Criteria
Element: Prepare to install resilient sheet
Interpret resilient sheet installation requirements from job and manufacturer instructions and calculate the quantities of materials required
Identify hazards relating to the work site, work practices, materials, tools and equipment, and check risk treatments are in place and operating
Select and check all required tools and equipment are ready to use, and organise to fix any deficiencies according to workplace procedures
Gather the resilient sheet, coatings, adhesives and other materials required by job instructions, and check they meet quality requirements and are prepared and ready to use or install according to the manufacturer instructions, product labels, safety data sheets and workplace procedures
Confirm the wall substrate is clean and suitable for installing the resilient sheet, and fix or report any deficiencies according to workplace procedures
Establish a mixing station in a safe, suitable location, and prepare the surface coating
Trial the surface coating to check the equipment is operating correctly and the consistency of the coating material and the surface finish are according to the manufacturer instructions
Apply surface coating to the required depth and coverage according to the manufacturer instructions and job requirements
Check internal and external corners for square
Check wall surfaces for plane, and smooth and clear them for further processing
Element: Cut, fit and fasten resilient sheet
Prepare feathering systems and applications and apply according to the manufacturer instructions and job instructions
Establish the starting point and mark out working lines
Cut and fasten any required pre-form fillet according to job instructions
Measure, mark and cut the resilient sheet as required
Apply adhesive to the wall according to the manufacturer instructions, product labels, safety data sheets and workplace procedures
Position and fasten the resilient sheet according to workplace procedures
Heat the resilient sheet to form profiles as required by job instructions
Weld the resilient sheet’s seams and joins according to the manufacturer instructions
Finish installing the resilient sheet and trim joins and seams
Check the resilient sheet is installed correctly according to job instructions and quality requirements, and fix any deficiencies
Element: Complete the task according to workplace procedures
Clean up the work area, identify items for recycling and dispose of waste
Identify, tag and report any damage to equipment and tools
Check, clean and do routine maintenance of equipment and tools and store them and unused materials
Complete task outcome documentation
Submission Requirements
List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here
Assessment task 1: [title] Due date:
(add new lines for each of the assessment tasks)
Assessment Tasks
Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.
Observation Checklist
Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice
Yes
No
Comments/feedback
Interpret resilient sheet installation requirements from job and manufacturer instructions and calculate the quantities of materials required
Identify hazards relating to the work site, work practices, materials, tools and equipment, and check risk treatments are in place and operating
Select and check all required tools and equipment are ready to use, and organise to fix any deficiencies according to workplace procedures
Gather the resilient sheet, coatings, adhesives and other materials required by job instructions, and check they meet quality requirements and are prepared and ready to use or install according to the manufacturer instructions, product labels, safety data sheets and workplace procedures
Confirm the wall substrate is clean and suitable for installing the resilient sheet, and fix or report any deficiencies according to workplace procedures
Establish a mixing station in a safe, suitable location, and prepare the surface coating
Trial the surface coating to check the equipment is operating correctly and the consistency of the coating material and the surface finish are according to the manufacturer instructions
Apply surface coating to the required depth and coverage according to the manufacturer instructions and job requirements
Check internal and external corners for square
Check wall surfaces for plane, and smooth and clear them for further processing
Prepare feathering systems and applications and apply according to the manufacturer instructions and job instructions
Establish the starting point and mark out working lines
Cut and fasten any required pre-form fillet according to job instructions
Measure, mark and cut the resilient sheet as required
Apply adhesive to the wall according to the manufacturer instructions, product labels, safety data sheets and workplace procedures
Position and fasten the resilient sheet according to workplace procedures
Heat the resilient sheet to form profiles as required by job instructions
Weld the resilient sheet’s seams and joins according to the manufacturer instructions
Finish installing the resilient sheet and trim joins and seams
Check the resilient sheet is installed correctly according to job instructions and quality requirements, and fix any deficiencies
Clean up the work area, identify items for recycling and dispose of waste
Identify, tag and report any damage to equipment and tools
Check, clean and do routine maintenance of equipment and tools and store them and unused materials
Complete task outcome documentation
Forms
Assessment Cover Sheet
MSFFL3116 - Install resilient sheet to walls
Assessment task 1: [title]
Student name:
Student ID:
I declare that the assessment tasks submitted for this unit are my own work.
Student signature:
Result: Competent Not yet competent
Feedback to student
Assessor name:
Signature:
Date:
Assessment Record Sheet
MSFFL3116 - Install resilient sheet to walls
Student name:
Student ID:
Assessment task 1: [title] Result: Competent Not yet competent
(add lines for each task)
Feedback to student:
Overall assessment result: Competent Not yet competent