Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

MSFFL3117 Mapping and Delivery Guide
Install mosaic and panel parquetry flooring

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency MSFFL3117 - Install mosaic and panel parquetry flooring
Description
Employability Skills
Learning Outcomes and Application
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to install mosaic and panel parquetry flooring
  • Interpret mosaic and panel parquetry flooring installation requirements from job and manufacturer instructions and calculate the quantities of materials required
  • Identify hazards relating to the work site, work practices, materials, tools and equipment, and check risk treatments are in place and operating
  • Select and check all required tools and equipment are ready to use, and organise to fix any deficiencies according to workplace procedures
  • Gather the parquetry flooring material and confirm its species, grade, size, quantity and quality against job instructions
  • Check and confirm the parquetry flooring material’s moisture content is suitable for site conditions according to workplace procedures
  • Gather adhesives, trims and other materials required by job instructions, and check they meet quality requirements and are prepared and ready to install according to the manufacturer instructions, product labels, safety data sheets and workplace procedures
       
Element: Install moisture vapour barrier and underlay
  • Confirm the subfloor is clean and suitable for installing the moisture vapour barrier and parquetry, and fix or report any deficiencies according to workplace procedures
  • Remove or undercut door jambs, cover trims and other joinery, and store for refitting or send for machining according to job instructions
  • Fasten the moisture vapour barrier according to manufacturer instructions
  • Measure, mark and cut underlay to length and size to minimise waste
  • Fasten underlay according to workplace procedures and manufacturer instructions
  • Finish installing underlay to meet quality requirements
       
Element: Cut, fit and fasten mosaic and panel parquetry flooring
  • Establish the starting point and mark out working lines
  • Lay out the parquetry flooring according to job instructions to maximise aesthetics with respect to material colours, grains and patterns, to minimise waste, and to ensure an efficient, quality installation
  • Measure, mark and cut parquetry fingers or panels as required
  • Apply adhesive to the substrate according to the according to the manufacturer instructions, product labels, safety data sheets and workplace procedures
  • Install the parquetry flooring according to the manufacturer instructions, allowing appropriate intermediate and perimeter expansion joints
  • Install finishing strips appropriate for the type of subfloor, refit removed items and finish installing the flooring
  • Check the parquetry flooring is installed correctly according to job instructions and quality requirements, and fix any deficiencies
  • Make any necessary preparations for sanding the parquetry flooring according to job instructions
       
Element: Complete the task according to workplace procedures
  • Clean up the work area, identify items for recycling and dispose of waste
  • Identify, tag and report any damage to equipment and tools
  • Check, clean and do routine maintenance on equipment and tools and store them and unused materials
  • Complete task outcome documentation
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Interpret mosaic and panel parquetry flooring installation requirements from job and manufacturer instructions and calculate the quantities of materials required 
Identify hazards relating to the work site, work practices, materials, tools and equipment, and check risk treatments are in place and operating 
Select and check all required tools and equipment are ready to use, and organise to fix any deficiencies according to workplace procedures 
Gather the parquetry flooring material and confirm its species, grade, size, quantity and quality against job instructions 
Check and confirm the parquetry flooring material’s moisture content is suitable for site conditions according to workplace procedures 
Gather adhesives, trims and other materials required by job instructions, and check they meet quality requirements and are prepared and ready to install according to the manufacturer instructions, product labels, safety data sheets and workplace procedures 
Confirm the subfloor is clean and suitable for installing the moisture vapour barrier and parquetry, and fix or report any deficiencies according to workplace procedures 
Remove or undercut door jambs, cover trims and other joinery, and store for refitting or send for machining according to job instructions 
Fasten the moisture vapour barrier according to manufacturer instructions 
Measure, mark and cut underlay to length and size to minimise waste 
Fasten underlay according to workplace procedures and manufacturer instructions 
Finish installing underlay to meet quality requirements 
Establish the starting point and mark out working lines 
Lay out the parquetry flooring according to job instructions to maximise aesthetics with respect to material colours, grains and patterns, to minimise waste, and to ensure an efficient, quality installation 
Measure, mark and cut parquetry fingers or panels as required 
Apply adhesive to the substrate according to the according to the manufacturer instructions, product labels, safety data sheets and workplace procedures 
Install the parquetry flooring according to the manufacturer instructions, allowing appropriate intermediate and perimeter expansion joints 
Install finishing strips appropriate for the type of subfloor, refit removed items and finish installing the flooring 
Check the parquetry flooring is installed correctly according to job instructions and quality requirements, and fix any deficiencies 
Make any necessary preparations for sanding the parquetry flooring according to job instructions 
Clean up the work area, identify items for recycling and dispose of waste 
Identify, tag and report any damage to equipment and tools 
Check, clean and do routine maintenance on equipment and tools and store them and unused materials 
Complete task outcome documentation 

Forms

Assessment Cover Sheet

MSFFL3117 - Install mosaic and panel parquetry flooring
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MSFFL3117 - Install mosaic and panel parquetry flooring

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: