Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

MSFFL3125 Mapping and Delivery Guide
Mix and apply thin-set terrazzo

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency MSFFL3125 - Mix and apply thin-set terrazzo
Description
Employability Skills
Learning Outcomes and Application
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to mix and apply thin-set terrazzo  
  • Interpret terrazzo application requirements from job and manufacturer instructions and calculate the quantities of materials required
  • Identify hazards relating to the work site, work practices, materials, tools and equipment, and check risk treatments are in place and operating
  • Select and check terrazzo mixing, installation and other required equipment and tools are ready to use, and organise to fix any deficiencies according to workplace procedures
  • Gather the terrazzo materials and other materials required by job instructions, and check they meet quality requirements and are ready to use according to the manufacturer instructions, product labels, safety data sheets and workplace procedures
       
Element: Mix, apply and finish off thin-set terrazzo
  • Establish a suitable mixing area and protect surrounding surfaces
  • Check and confirm the substrate is free of cracks, flat, primed, clean and otherwise prepared and suitable for installing terrazzo
  • Check the substrate’s moisture content is suitable for installing thin-set terrazzo according to manufacturer instructions
  • Place floor divider strips for aesthetic purposes and for control and expansion joints, according to job instructions
  • Mix the terrazzo base and other ingredients according to the manufacturer instructions, product labels, safety data sheets and workplace procedures
  • Spread and trowel the terrazzo mix to the appropriate thickness, according to workplace procedures and manufacturer instructions
  • After the surface has cured, grind, grout, polish and seal the surface according to workplace procedures and manufacturer instructions
       
Element: Complete the task according to workplace procedures
  • Clean up the work area, identify items for recycling and dispose of waste
  • Identify, tag and report any damage to equipment and tools
  • Check, clean and do routine maintenance on equipment and tools and store them and unused materials
  • Complete task outcome documentation
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Interpret terrazzo application requirements from job and manufacturer instructions and calculate the quantities of materials required 
Identify hazards relating to the work site, work practices, materials, tools and equipment, and check risk treatments are in place and operating 
Select and check terrazzo mixing, installation and other required equipment and tools are ready to use, and organise to fix any deficiencies according to workplace procedures 
Gather the terrazzo materials and other materials required by job instructions, and check they meet quality requirements and are ready to use according to the manufacturer instructions, product labels, safety data sheets and workplace procedures 
Establish a suitable mixing area and protect surrounding surfaces 
Check and confirm the substrate is free of cracks, flat, primed, clean and otherwise prepared and suitable for installing terrazzo 
Check the substrate’s moisture content is suitable for installing thin-set terrazzo according to manufacturer instructions 
Place floor divider strips for aesthetic purposes and for control and expansion joints, according to job instructions 
Mix the terrazzo base and other ingredients according to the manufacturer instructions, product labels, safety data sheets and workplace procedures 
Spread and trowel the terrazzo mix to the appropriate thickness, according to workplace procedures and manufacturer instructions 
After the surface has cured, grind, grout, polish and seal the surface according to workplace procedures and manufacturer instructions 
Clean up the work area, identify items for recycling and dispose of waste 
Identify, tag and report any damage to equipment and tools 
Check, clean and do routine maintenance on equipment and tools and store them and unused materials 
Complete task outcome documentation 

Forms

Assessment Cover Sheet

MSFFL3125 - Mix and apply thin-set terrazzo
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MSFFL3125 - Mix and apply thin-set terrazzo

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: