Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

MSFGG4004 Mapping and Delivery Guide
Perform laser measurement and levelling for glass windows and doors in buildings

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency MSFGG4004 - Perform laser measurement and levelling for glass windows and doors in buildings
Description
Employability Skills
Learning Outcomes and Application This unit of competency covers using and maintaining laser measuring and levelling devices to check measurements and apply levelling for installation of glass windows and doors in buildings. It involves taking accurate measurements/readings, making calculations for levelling and alignment glass component installation tasks in job roles requiring discretion, judgement and problem solving. No licensing, legislative or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Assessors must:

hold training and assessment competencies as determined by the National Skills Standards Council (NSSC) or its successors

have vocational competency in the furnishing industry at least to the level being assessed with broad industry knowledge and experience, usually combined with a relevant industry qualification

be familiar with the current skills and knowledge used and have relevant, current experience in the furnishing industry.

Assessment methods must confirm consistency of performance over time rather than a single assessment event and in a range of workplace relevant contexts.

Assessment must be by observation of relevant tasks with questioning on underpinning knowledge and, where applicable, multimedia evidence, supervisor’s reports, projects and work samples.

Assessment is to be conducted on single units of competency or in conjunction with other related units of competency. Foundation skills are integral to competent performance in the unit and should not be assessed separately.

Assessment must occur on the job or in a workplace simulated facility with relevant process, equipment, materials, work instructions and deadlines.

Access is required to laser levelling equipment, glass window and door components, work instructions, manufacturer documentation and organisational guidelines.

Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare for glass laser measurement and levelling
  • Task requirements are determined by inspection of glass window and door components to be installed in a building and following relevant plans, drawings and texts in accordance with the work plan
  • Appropriate laser levelling equipment for the installation job is selected and set up to manufacturer recommendations
  • Levelling is planned in detail including sequencing and prioritising tasks and system requirements
  • Potential hazards to personnel and other building components at the installation site are identified and prevention and/or control measures are selected in accordance with the work plan
  • Individual’s roles and responsibilities within the installation team are identified, and where required, assisted with provision of on-the-job training for the tasks
       
Element: Use laser devices to make measurements
  • Measurements are taken accurately, interpreted and recorded correctly to standard operating procedures
  • Laser levelling devices are operated to manufacturer specifications or standard operating procedures
  • Datum point is set up or located
  • Readings are taken to datum and at nominated or selected stations, to project specifications
       
Element: Perform levelling
  • Levelling realignment calculations are performed using correct and appropriate method for the installation levelling/alignment application
  • Glass window and door components are levelled and aligned to specifications using correct and appropriate techniques, and adjustments made to ensure compliance with manufacturer specifications and the work plan
  • Glass components are temporarily fixed in the assigned installation positions prior to final measurement
  • Final level and alignment inspections are undertaken, any adjustments made and glass components fixed to the building using appropriate fasteners
       
Element: Complete work
  • Glass installation rating compliance certificate is completed
  • Levelling equipment is closed own and appropriate personnel notified of completed installation in accordance with enterprise requirements
  • Work area is cleared of waste, cleaned, restored and secured in accordance with site/enterprise procedures
  • Plant, tools and equipment are maintained and stored in accordance with site/enterprise procedures
  • Work completion details are finalised in accordance with enterprise procedures
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for glass laser measurement and levelling

1.1

Task requirements are determined by inspection of glass window and door components to be installed in a building and following relevant plans, drawings and texts in accordance with the work plan

1.2

Appropriate laser levelling equipment for the installation job is selected and set up to manufacturer recommendations

1.3

Levelling is planned in detail including sequencing and prioritising tasks and system requirements

1.4

Potential hazards to personnel and other building components at the installation site are identified and prevention and/or control measures are selected in accordance with the work plan

1.5

Individual’s roles and responsibilities within the installation team are identified, and where required, assisted with provision of on-the-job training for the tasks

2

Use laser devices to make measurements

2.1

Measurements are taken accurately, interpreted and recorded correctly to standard operating procedures

2.2

Laser levelling devices are operated to manufacturer specifications or standard operating procedures

2.3

Datum point is set up or located

2.4

Readings are taken to datum and at nominated or selected stations, to project specifications

3

Perform levelling

3.1

Levelling realignment calculations are performed using correct and appropriate method for the installation levelling/alignment application

3.2

Glass window and door components are levelled and aligned to specifications using correct and appropriate techniques, and adjustments made to ensure compliance with manufacturer specifications and the work plan

3.3

Glass components are temporarily fixed in the assigned installation positions prior to final measurement

3.4

Final level and alignment inspections are undertaken, any adjustments made and glass components fixed to the building using appropriate fasteners

4

Complete work

4.1

Glass installation rating compliance certificate is completed

4.2

Levelling equipment is closed own and appropriate personnel notified of completed installation in accordance with enterprise requirements

4.3

Work area is cleared of waste, cleaned, restored and secured in accordance with site/enterprise procedures

4.4

Plant, tools and equipment are maintained and stored in accordance with site/enterprise procedures

4.5

Work completion details are finalised in accordance with enterprise procedures

Accurately select, set and use laser levelling devices to obtain and interpret specified measurements

Maintain and store laser levelling devices

Read, interpret and follow information on standard operating procedures, manufacturer recommendations, drawings and other applicable reference documents

Set up levelling equipment and take levelling measurements and perform necessary calculations

Confirm accuracy of the readings taken, including set up and movement of laser levelling device in two locations

Level and align a range of glass window and door components for installation in buildings

Confirm work requirements and specifications and the report work outcomes and problems and follow safety procedures

Avoid backtracking, work flow interruptions or wastage

Work with others and in a team by recognising dependencies and using cooperative approaches to optimise work flow and productivity

AS 2047-2014 Windows in buildings - Selection and Installation

AS1288-2006 Glass in buildings - Selection and Installation

Note, wherever Australia Standards are listed they apply at the time of publication, but the most current version (including amendments) or replacement versions are to be used.

Terminology and concepts relating to electrical/electronic measurement

Specifications of a range of commonly used laser levelling devices and their features for application in the glass industry

Settings and the correct scale for each setting on laser levelling devices and procedures for obtaining accurate measurements

Levelling device types, characteristics, technical capabilities and limitations

Maintenance and storage requirements for a range of laser levelling devices

Principles of levelling and alignment and numerical operations, geometry and calculations/formulae for levelling

Effects on installed glass window and door components if not correctly levelled and aligned

Techniques, tools, equipment and procedures to carry out levelling and installation of glass components in buildings

Hazards and control measures associated with levelling and alignment and relevant safe work practices and procedures

Use and application of personal protective equipment

Relevant environmental, WHS legislation and regulations

Technical drawings and manufacturers manuals

Shimming and packing materials

Glass product specifications and tolerances

Hierarchy of control and basis of control for glass plant/s

Communication protocols (e.g. radio, phone, computer and paper, permissions/authorities)


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for glass laser measurement and levelling

1.1

Task requirements are determined by inspection of glass window and door components to be installed in a building and following relevant plans, drawings and texts in accordance with the work plan

1.2

Appropriate laser levelling equipment for the installation job is selected and set up to manufacturer recommendations

1.3

Levelling is planned in detail including sequencing and prioritising tasks and system requirements

1.4

Potential hazards to personnel and other building components at the installation site are identified and prevention and/or control measures are selected in accordance with the work plan

1.5

Individual’s roles and responsibilities within the installation team are identified, and where required, assisted with provision of on-the-job training for the tasks

2

Use laser devices to make measurements

2.1

Measurements are taken accurately, interpreted and recorded correctly to standard operating procedures

2.2

Laser levelling devices are operated to manufacturer specifications or standard operating procedures

2.3

Datum point is set up or located

2.4

Readings are taken to datum and at nominated or selected stations, to project specifications

3

Perform levelling

3.1

Levelling realignment calculations are performed using correct and appropriate method for the installation levelling/alignment application

3.2

Glass window and door components are levelled and aligned to specifications using correct and appropriate techniques, and adjustments made to ensure compliance with manufacturer specifications and the work plan

3.3

Glass components are temporarily fixed in the assigned installation positions prior to final measurement

3.4

Final level and alignment inspections are undertaken, any adjustments made and glass components fixed to the building using appropriate fasteners

4

Complete work

4.1

Glass installation rating compliance certificate is completed

4.2

Levelling equipment is closed own and appropriate personnel notified of completed installation in accordance with enterprise requirements

4.3

Work area is cleared of waste, cleaned, restored and secured in accordance with site/enterprise procedures

4.4

Plant, tools and equipment are maintained and stored in accordance with site/enterprise procedures

4.5

Work completion details are finalised in accordance with enterprise procedures

Specifies different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Range is restricted to essential operating conditions and any other variables essential to the work environment.

Unit scope includes:

implementation of procedures and techniques for the safe, effective and efficient management of laser levelling equipment used in installing glass windows and doors

the identification of viable options and the selection of options that best meet the required outcomes

working with others to undertake and complete the application of precise laser levelling during glass component installation in buildings

Work health and safety (WHS) requirements include:

Commonwealth, state or territory legislation and regulations

organisational safety policies and procedures

the use of personal protective equipment and clothing

firefighting equipment

first aid equipment

hazard and risk control and elimination of hazardous materials and substances

manual handling, including lifting and carrying

Procedures include:

work instructions

standard operating procedures

written, verbal or computer-based procedures

Organisational requirements include:

legal, organisational and site guidelines, policies and procedures relating to own role and responsibility

quality assurance

procedural manuals

quality and continuous improvement processes and standards

ethical standards

recording and reporting

access and equity principles and practices

equipment use, maintenance and storage

environmental management (waste disposal, recycling and re-use guidelines)

Equipment and tools include:

dumpy/optical level

rotating laser level

line and dot level

duel beam level

laser square level

other associated levelling and aligning equipment

Levelling and/or alignment procedures include:

face and rim, reverse indicator, use of jacking bolts and shimming material, and use of levelling equipment

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Task requirements are determined by inspection of glass window and door components to be installed in a building and following relevant plans, drawings and texts in accordance with the work plan 
Appropriate laser levelling equipment for the installation job is selected and set up to manufacturer recommendations 
Levelling is planned in detail including sequencing and prioritising tasks and system requirements 
Potential hazards to personnel and other building components at the installation site are identified and prevention and/or control measures are selected in accordance with the work plan 
Individual’s roles and responsibilities within the installation team are identified, and where required, assisted with provision of on-the-job training for the tasks 
Measurements are taken accurately, interpreted and recorded correctly to standard operating procedures 
Laser levelling devices are operated to manufacturer specifications or standard operating procedures 
Datum point is set up or located 
Readings are taken to datum and at nominated or selected stations, to project specifications 
Levelling realignment calculations are performed using correct and appropriate method for the installation levelling/alignment application 
Glass window and door components are levelled and aligned to specifications using correct and appropriate techniques, and adjustments made to ensure compliance with manufacturer specifications and the work plan 
Glass components are temporarily fixed in the assigned installation positions prior to final measurement 
Final level and alignment inspections are undertaken, any adjustments made and glass components fixed to the building using appropriate fasteners 
Glass installation rating compliance certificate is completed 
Levelling equipment is closed own and appropriate personnel notified of completed installation in accordance with enterprise requirements 
Work area is cleared of waste, cleaned, restored and secured in accordance with site/enterprise procedures 
Plant, tools and equipment are maintained and stored in accordance with site/enterprise procedures 
Work completion details are finalised in accordance with enterprise procedures 

Forms

Assessment Cover Sheet

MSFGG4004 - Perform laser measurement and levelling for glass windows and doors in buildings
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MSFGG4004 - Perform laser measurement and levelling for glass windows and doors in buildings

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: