Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
MSFGG4006 Mapping and Delivery Guide
Operate complex glass processing plant control systems
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | MSFGG4006 - Operate complex glass processing plant control systems |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit of competency covers operating a complex glass processing plant control panel utilising control loops and a broad range of control algorithms to control plant areas and multiple products/process streams. It will typically be located in a control room and require managing multiple complex tasks.The technician/central control room operator takes overall responsibility for the operation of all equipment and processes within the plant area and may include optimisation of the area using the control system. No licensing, legislative or certification requirements apply to this unit at the time of publication. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. Assessors must: hold training and assessment competencies as determined by the National Skills Standards Council (NSSC) or its successors have vocational competency in the furnishing industry at least to the level being assessed with broad industry knowledge and experience, usually combined with a relevant industry qualification be familiar with the current skills and knowledge used and have relevant, current experience in the furnishing industry. Assessment methods must confirm consistency of performance over time rather than a single assessment event and in a range of workplace relevant contexts. Assessment must be by observation of relevant tasks with questioning on underpinning knowledge and, where applicable, multimedia evidence, supervisor’s reports, projects and work samples. Assessment is to be conducted on single units of competency or in conjunction with other related units of competency. Foundation skills are integral to competent performance in the unit and should not be assessed separately. Assessment must occur on the job or in a workplace simulated facility with relevant process, equipment, materials, work instructions and deadlines. Access is required to control systems for glass processing plant and equipment, workplace documentation, procedures and job requirements. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Use operator interface |
| |||||||
Element: Access control information |
| |||||||
Element: Control process variations and monitor operations |
| |||||||
Element: Facilitate planned and unplanned process start-ups and shutdowns |
| |||||||
Element: Respond to alarms or out of specification conditions and control hazards |
| |||||||
Element: Resolve other problems within scope of responsibility |
|