Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

MSMPMC322 Mapping and Delivery Guide
Deliver concrete to site

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency MSMPMC322 - Deliver concrete to site
Description
Employability Skills
Learning Outcomes and Application This unit describes the skills and knowledge required to deliver concrete to site using an agitator or similar.This unit applies to operators who are required to take responsibility for own outputs and follow established procedures to safely drive and position the agitator truck; load agitator; mix and discharge concrete on site and communicate with customers. Operators are also required to work autonomously and apply their own judgement to interpret information; monitor processes; identify and address routine and non-routine problems and control hazards. This unit applies to an individual working independently and with frequent contact with the base plant personnel.The operator is required to hold a current driver’s licence appropriate to the agitator truck as required by local regulations. Relevant legislation, industry standards and codes of practice within Australia must also be applied.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Operations
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Load agitator
  • Check job requirements
  • Position agitator for loading
  • Load agitator with correct concrete batch
  • Check and action any special requirements
  • Check that slump is to specification and make necessary adjustments
       
Element: Deliver concrete
  • Deliver concrete without delay
  • Position vehicle or agitator as required by safety needs and if practical customer requirements
  • Report breakdowns or lengthy delays en route to relevant person
  • Maintain product quality as per requirements and procedures
       
Element: Conform to site protocols
  • Check access to site with customer
  • Assess site conditions and enter in a manner suited to the conditions, load and site requirements
  • Mix concrete on site according to quality requirements
  • Discharge concrete as required by customer
  • Wash down chutes and agitator in the area designated by the customer
  • Complete all records
       
Element: Rectify routine problems
  • Identify and rectify faults and equipment failure
  • Maintain records and log books of equipment operations
  • Identify non-routine problems and report to designated person
       
Element: Control hazards
  • Identify concrete delivery hazards
  • Assess the risks arising from those hazards
  • Implement measures to control those risks
  • Check job requirements
  • Position agitator for loading
  • Load agitator with correct concrete batch
  • Check and action any special requirements
  • Check that slump is to specification and make necessary adjustments
  • Deliver concrete without delay
  • Position vehicle or agitator as required by safety needs and if practical customer requirements
  • Report breakdowns or lengthy delays en route to relevant person
  • Maintain product quality as per requirements and procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Check job requirements 
Position agitator for loading 
Load agitator with correct concrete batch 
Check and action any special requirements 
Check that slump is to specification and make necessary adjustments 
Deliver concrete without delay 
Position vehicle or agitator as required by safety needs and if practical customer requirements 
Report breakdowns or lengthy delays en route to relevant person 
Maintain product quality as per requirements and procedures 
Check access to site with customer 
Assess site conditions and enter in a manner suited to the conditions, load and site requirements 
Mix concrete on site according to quality requirements 
Discharge concrete as required by customer 
Wash down chutes and agitator in the area designated by the customer 
Complete all records 
Identify and rectify faults and equipment failure 
Maintain records and log books of equipment operations 
Identify non-routine problems and report to designated person 
Identify concrete delivery hazards 
Assess the risks arising from those hazards 
Implement measures to control those risks 
Check job requirements 
Position agitator for loading 
Load agitator with correct concrete batch 
Check and action any special requirements 
Check that slump is to specification and make necessary adjustments 
Deliver concrete without delay 
Position vehicle or agitator as required by safety needs and if practical customer requirements 
Report breakdowns or lengthy delays en route to relevant person 
Maintain product quality as per requirements and procedures 

Forms

Assessment Cover Sheet

MSMPMC322 - Deliver concrete to site
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MSMPMC322 - Deliver concrete to site

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: