Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
RIICRC302A Mapping and Delivery Guide
Place and form concrete kerb, channel and fixtures
Version 1.0
Issue Date: June 2024
Qualification | - |
Unit of Competency | RIICRC302A - Place and form concrete kerb, channel and fixtures |
---|---|---|---|
Description | This unit covers the placing and forming of concrete kerbs, channels and fixtures in the civil construction industry. It includes planning and preparing, setting out and preparing for construction/installation, forming kerb and barrier strips, pouring concrete to installed formwork, finishing kerbs, channels and fixtures, installing pre-cast concrete units, repairing kerb, gutters and median barrier strips, and cleaning up. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and industry sectors. Relevant information must be sourced prior to application of the unit. | ||
Employability Skills | This unit contains employability skills. | ||
Learning Outcomes and Application | This unit is appropriate for those working in an operational role at worksites within:Civil construction | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Not applicable. Not applicable. | ||
Competency Field | Refer to Unit Sector(s). |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan and prepare |
| |||||||
Element: Set out and prepare for construction/ installation |
| |||||||
Element: Form kerb and barrier strips |
| |||||||
Element: Pour concrete to installed formwork |
| |||||||
Element: Finish kerbs, channels and fixtures |
| |||||||
Element: Install pre-cast concrete units |
| |||||||
Element: Repair kerb, gutters and median, barrier strips |
| |||||||
Element: Clean up |
|