Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

RIIHAN308D Mapping and Delivery Guide
Load and unload plant

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency RIIHAN308D - Load and unload plant
Description
Employability Skills
Learning Outcomes and Application Load and unload plant in the Resources and Infrastructure Industries.This unit is appropriate for those working in operational roles.Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories and industry sectors. Relevant information must be sourced prior to application of the unit.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan and prepare to load and unload plant
  • Access, interpret and apply load handling documentation and ensure compliance the work activity is compliant
  • Obtain, read, interpret, clarify and confirm work requirements
  • Identify and address potential risks, hazards and environmental issues, and implement control measures
  • Select and wear personal protective equipment appropriate for work activities
  • Identify, obtain and implement signage and barriers and ensure the loading/unloading site is made safe and isolated from general traffic flow
       
Element: Load the plant
  • Confirm the dimensions and capacity of the float/trailer to safely carry the plant item
  • Select tools and loading equipment, check for serviceability/faults and rectify or report, verbally or in writing, prior to commencement
  • Confirm preparation of the plant for transportation has been completed
  • Place and secure loading aids
  • Confirm loading procedure with operator and/or guide before loading commences
  • Move the plant item onto the trailer/float and halt at the designated position
       
Element: Unload the plant
  • Confirm the unloading procedure with operator and/or guide before unloading commences
  • Place and secure unloading aids, including ramps, in accordance with the trailer/float specifications
  • Slacken securing devices and remove in a sequence which optimises safety
  • Move the plant item off the trailer/float and halt at the designated position
  • Stow loading aids including ramps, bridging materials and securing devices
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

1. Plan and prepare to load and unload plant

1.1 Access, interpret and apply load handling documentation and ensure compliance the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures

1.4 Select and wear personal protective equipment appropriate for work activities

1.5 Identify, obtain and implement signage and barriers and ensure the loading/unloading site is made safe and isolated from general traffic flow

2. Load the plant

2.1 Confirm the dimensions and capacity of the float/trailer to safely carry the plant item

2.2 Select tools and loading equipment, check for serviceability/faults and rectify or report, verbally or in writing, prior to commencement

2.3 Confirm preparation of the plant for transportation has been completed

2.4 Place and secure loading aids

2.5 Confirm loading procedure with operator and/or guide before loading commences

2.6 Move the plant item onto the trailer/float and halt at the designated position

3. Unload the plant

3.1 Confirm the unloading procedure with operator and/or guide before unloading commences

3.2 Place and secure unloading aids, including ramps, in accordance with the trailer/float specifications

3.3 Slacken securing devices and remove in a sequence which optimises safety

3.4 Move the plant item off the trailer/float and halt at the designated position

3.5 Stow loading aids including ramps, bridging materials and securing devices


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

1. Plan and prepare to load and unload plant

1.1 Access, interpret and apply load handling documentation and ensure compliance the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures

1.4 Select and wear personal protective equipment appropriate for work activities

1.5 Identify, obtain and implement signage and barriers and ensure the loading/unloading site is made safe and isolated from general traffic flow

2. Load the plant

2.1 Confirm the dimensions and capacity of the float/trailer to safely carry the plant item

2.2 Select tools and loading equipment, check for serviceability/faults and rectify or report, verbally or in writing, prior to commencement

2.3 Confirm preparation of the plant for transportation has been completed

2.4 Place and secure loading aids

2.5 Confirm loading procedure with operator and/or guide before loading commences

2.6 Move the plant item onto the trailer/float and halt at the designated position

3. Unload the plant

3.1 Confirm the unloading procedure with operator and/or guide before unloading commences

3.2 Place and secure unloading aids, including ramps, in accordance with the trailer/float specifications

3.3 Slacken securing devices and remove in a sequence which optimises safety

3.4 Move the plant item off the trailer/float and halt at the designated position

3.5 Stow loading aids including ramps, bridging materials and securing devices

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Access, interpret and apply load handling documentation and ensure compliance the work activity is compliant 
Obtain, read, interpret, clarify and confirm work requirements 
Identify and address potential risks, hazards and environmental issues, and implement control measures 
Select and wear personal protective equipment appropriate for work activities 
Identify, obtain and implement signage and barriers and ensure the loading/unloading site is made safe and isolated from general traffic flow 
Confirm the dimensions and capacity of the float/trailer to safely carry the plant item 
Select tools and loading equipment, check for serviceability/faults and rectify or report, verbally or in writing, prior to commencement 
Confirm preparation of the plant for transportation has been completed 
Place and secure loading aids 
Confirm loading procedure with operator and/or guide before loading commences 
Move the plant item onto the trailer/float and halt at the designated position 
Confirm the unloading procedure with operator and/or guide before unloading commences 
Place and secure unloading aids, including ramps, in accordance with the trailer/float specifications 
Slacken securing devices and remove in a sequence which optimises safety 
Move the plant item off the trailer/float and halt at the designated position 
Stow loading aids including ramps, bridging materials and securing devices 

Forms

Assessment Cover Sheet

RIIHAN308D - Load and unload plant
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

RIIHAN308D - Load and unload plant

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: