Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

RIIOGD403A Mapping and Delivery Guide
Conduct drilling operations

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency RIIOGD403A - Conduct drilling operations
Description This unit covers the conduct of drilling operations in the drilling industry. It includes planning and preparing for drilling operations, commencing drilling operations, maintaining drilling operations, drilling intermediate and/or main holes, and preparing for hole abandonment. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and industry sectors. Relevant information must be sourced prior to application of the unit.
Employability Skills This unit contains employability skills.
Learning Outcomes and Application This unit is appropriate for those working in a supervisory role or as a technical specialist, at worksites within:Drilling
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites Not applicable. Not applicable.
Competency Field Refer to Unit Sector(s).
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan and prepare for drilling operations
  • Access, interpret and apply compliance documentation relevant to the work activity
  • Obtain, confirm and apply work instructions for the allocated task
  • Identify, manage and report all potential hazards
  • Communicate emergency response and occupational health and safety requirements, including the possibility of wellbore influx and well control, to crew members
  • Resolve and maintain coordination requirements with others at the site prior to commencing and during work activities
  • Check, clean and lubricate equipment, including mud riser/conductor/connections and rectify and report faults
  • Check tool requirements and assembled in wellhead area
       
Element: Commence drilling operations
  • Double-check drilling program requirements to ensure safe operations
  • Undertake surface hole drilling in accordance with Job Safety Analysis (JSA) and drilling program, and confirm with operator's representative
  • Commence intermediate and main hole drilling operations
  • Monitor, maintain and record drilling parameters in line with drilling program
  • Calculate and maintain kill sheet requirements and carry out and record integrity tests in line with drilling program
  • Maintain accurate tubular tallies
  • Inspect and prepare casing running tools and casing for operation
       
Element: Maintain drilling operations
  • Undertake cementing preparations in accordance with operator's instructions and company procedures
  • Run casing and prepare for cementing in accordance with job safety analysis, and cement in accordance with well engineering prognosis
  • Undertake preparations, and give assistance in drilling stem tests and logging and coring operations
  • Instruct crew on safe core recovery procedures
  • Put arrangements in place for nippling-up and drilling out
       
Element: Drill intermediate and/or main holes
  • Confirm drilling program/timing schedule and comply with procedures
  • Check equipment and tools for sizing and integrity with faults being rectified/reported
  • Maintain hole within deviation limits
  • Adhere to sound drilling and safety practices during nippling-up and pressure testing operations
       
Element: Prepare for hole abandonment
  • Confirm program for completion or abandonment with operator representative
  • Check tools/equipment for integrity and record and report faults
  • Complete appropriate communication and recording requirements to regulations and company policies/procedures
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:

knowledge of the requirements, procedures and instructions for conducting drilling operations

implementation of requirements, procedures and techniques for the safe, effective and efficient completion of drilling operations

working with others to plan, prepare and conduct drilling operations

evidence of the consistent successful conduct of drilling operations

Context of and specific resources for assessment

This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.

Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.

The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.

Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.

Aboriginal people and other people from a non English speaking background may have second language issues.

Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required.

Method of assessment

This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:

written and/or oral assessment of the candidate's required knowledge

observed, documented and/or first hand testimonial evidence of the candidate's:

implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes

consistent achievement of required outcomes

first hand testimonial evidence of the candidate's:

working with others to undertake and complete drilling operations

provision of clear and timely instruction and supervision by the individual of those involved in the conduct of drilling operations

Guidance information for assessment

Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

Specific skills are required to achieve the Performance Criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes the ability to carry out the following, as required to conduct drilling operations:

apply legislative, organisation and site requirements and procedures for conducting drilling operations

operate rig in a safe and productive manner

delegate work to individuals according to established levels of skill

administer effective communication skills - oral and written

troubleshoot and problem solve, including rise in rotary torque and mud pressure

forward planning in preparation of changing circumstances/contingencies

use a calculator and convert from metric to imperial measurements

shutdown the rig in an emergency and coordinate an orderly evacuation if necessary

perform calculations including:

quantities

up-hole velocity

specific gravity

volumes and capacities

pressure calculations

Required knowledge

Specific knowledge is required to achieve the Performance Criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes knowledge of the following, as required to conduct drilling operations:

rig components

rig specifications

hole recovery procedures, including fishing, assembly service maintenance and tools

potential problems

down hole conditions

types of mud available

rigging and slinging

rig maintenance procedures

evacuation procedures

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Relevant compliance documentation may include:

legislative, organisational and site requirements and procedures including:

Job Safety Analysis (JSA)

environmental guidelines

specifications

operator's instructions

drilling program

technical information

Petroleum Act

daily pre-tour checklist

daily pre-drilling checklist

Job Sheet Analysis (JSA)

API RP 53

API RP 59 (if applicable)

site specific manual

manufacturer's guidelines and specifications

Australian standards

code of practice

Employment and workplace relations legislation

Equal Employment Opportunity and Disability Discrimination legislation

Work instructions may come from briefings, handovers, plans and work orders and may be written or verbal, formal or informal and may include:

discussing and confirming drill program requirements with crew members

pre-job requirements

drilling parameters, which may include:

surveys

pressure testing

conditioning the hole

circulating and penetration rates

mud properties

BHA performance parameters, which may include, make-up torque

ancillary operation, which may include:

logging

cementing

rig-up operations

pre-tour safety meeting

safety meeting/briefing

handover with oncoming driller

maintaining records including:

tour sheet

API metric tour report

kill sheet

incident report form

drilling line record sheet

shut-in procedures

weekly safety meeting report

pre-tour safety meeting report

warning/counselling record

equipment damage report

taking remedial action including alteration to drilling program as approved by operator's representative via operator company head office

nature and scope of tasks

Hazards may include:

working in proximity to drilling rig

working in different conditions including:

night time operations

day time operations

hot climates

cold climates

wet weather conditions

high wind

Coordination requirements may include instructing and communicating with:

drill crew

other equipment operators

maintenance personnel

contractors

supervisors

site personnel

Equipment may include:

wellhead equipment

casing centraliser and nails

thread lubricant

cement plugs

cement mix chemicals

bottom hole assembly (BHA)

tubulars

mud equipment

Records may include:

WIP sheets

WIP volumes

Kill sheets

Slow circulation rates (SCR)

Communication may be via a range of channels which may include:

2-way radio

hand signals

telephone

public address system

written work instructions

intranet and internet

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Access, interpret and apply compliance documentation relevant to the work activity 
Obtain, confirm and apply work instructions for the allocated task 
Identify, manage and report all potential hazards 
Communicate emergency response and occupational health and safety requirements, including the possibility of wellbore influx and well control, to crew members 
Resolve and maintain coordination requirements with others at the site prior to commencing and during work activities 
Check, clean and lubricate equipment, including mud riser/conductor/connections and rectify and report faults 
Check tool requirements and assembled in wellhead area 
Double-check drilling program requirements to ensure safe operations 
Undertake surface hole drilling in accordance with Job Safety Analysis (JSA) and drilling program, and confirm with operator's representative 
Commence intermediate and main hole drilling operations 
Monitor, maintain and record drilling parameters in line with drilling program 
Calculate and maintain kill sheet requirements and carry out and record integrity tests in line with drilling program 
Maintain accurate tubular tallies 
Inspect and prepare casing running tools and casing for operation 
Undertake cementing preparations in accordance with operator's instructions and company procedures 
Run casing and prepare for cementing in accordance with job safety analysis, and cement in accordance with well engineering prognosis 
Undertake preparations, and give assistance in drilling stem tests and logging and coring operations 
Instruct crew on safe core recovery procedures 
Put arrangements in place for nippling-up and drilling out 
Confirm drilling program/timing schedule and comply with procedures 
Check equipment and tools for sizing and integrity with faults being rectified/reported 
Maintain hole within deviation limits 
Adhere to sound drilling and safety practices during nippling-up and pressure testing operations 
Confirm program for completion or abandonment with operator representative 
Check tools/equipment for integrity and record and report faults 
Complete appropriate communication and recording requirements to regulations and company policies/procedures 

Forms

Assessment Cover Sheet

RIIOGD403A - Conduct drilling operations
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

RIIOGD403A - Conduct drilling operations

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: