Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

TLILIC0005 Mapping and Delivery Guide
Licence to operate a boom-type elevating work platform (boom length 11 metres or more)

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency TLILIC0005 - Licence to operate a boom-type elevating work platform (boom length 11 metres or more)
Description
Employability Skills
Learning Outcomes and Application This unit specifies the skills and knowledge required to safely operate a boom-type Elevating Work Platform (EWP) where the length of the boom is 11 metres or more in accordance with all relevant legislative requirements. Competence in this unit, does not in itself result in a Risk Work Licence (HRWL) to operate this plant.Boom-type elevating work platform means a telescoping device, hinged device, or articulated device, or any combination of these, used to support a platform on which personnel, equipment and materials may be elevated.A person performing this work is required to hold a boom-type elevating work platform HRWL.This unit requires a person operating an EWP to:plan for the work/taskprepare for the work/taskperform work/task pack up.Licensing/Regulatory InformationLegislative and regulatory requirements are applicable to this unit of competency. This unit is based on the licensing requirements of Part 4.5 of the Model Work Health and Safety (WHS) Regulations and meets Commonwealth, State and Territory HRWL requirements. The National Assessment Instrument (NAI) is the mandated assessment for the HRWL to operate the relevant licencing class as detailed in this unit.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field LIC - Licencing Units
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan work/task
  • Task requirements are identified from work orders or equivalent and confirmed with relevant people and a site inspection is completed in accordance with workplace procedures
  • Work area ground/operating surface is assessed to determine suitability for operational use of EWP in accordance with manufacturer requirements and workplace procedures
  • EWP capabilities are established for the load/s and work/task requirements in accordance with manufacturer requirements and workplace procedures
  • Appropriate paths for operating the EWP and moving in work area are assessed and determined in accordance with workplace procedures
  • Relevant hazard and risk control measures are applied and advised to relevant person/s in accordance with workplace procedures
  • Traffic management plan implementation is confirmed in accordance with workplace procedures
  • Appropriate communication procedures are identified, with relevant people in accordance with workplace procedures
  • All work is confirmed to ensure coverage of work/task requirements for the relevant work area in accordance with workplace procedures
       
Element: Prepare for work/task
  • Consultation with workplace person/s is maintained to ensure workplan is clear and consistent with site requirements in accordance with workplace procedures
  • Risk control measures for hazards identified are checked for implementation in accordance with workplace procedures
  • Safety equipment including Personal Protective Equipment (PPE) are inspected, fitted correctly and used in accordance with manufacturer requirements and safe work procedures
  • EWP is accessed in a safe manner in accordance with manufacturer requirements and safe work procedures
  • Pre-start EWP checks are carried out in accordance with manufacturers requirements and safe work procedures
  • EWP is started and is checked for any abnormal noises in accordance safe work procedures
  • EWP is positioned correctly as per work plan in work area in accordance with relevant manufacturer requirements and safe work procedures
  • EWP is stabilised appropriately in accordance with the workplan, relevant manufacturer requirements and safe work procedures
  • Operational checks from base controls are carried out in accordance with relevant manufacturer requirements and safe work procedures
  • All platform controls are located, identified and tested in accordance with manufacturer requirements and safe work procedures
  • All damage and defects are reported and appropriate action is taken to rectify in accordance with manufacturer requirements and safe work procedures
  • EWP logbook is inspected and is correct for the EWP, is completed and signed in accordance with manufacturer requirements and safe work procedures
  • Weather and work environmental conditions are assessed to determine any impact on EWP operation and positioning as per workplan in accordance with manufacturer requirements and safe work procedures
       
Element: Perform work/task
  • Relevant hazard prevention/control measures identified are checked for implementation in accordance with safe work procedures
  • EWP is safely located at point of work in work area in accordance with safe work procedures
  • EWP platform is positioned for work tasks and stability and all operations are monitored constantly in accordance with safe work procedures
  • Work gear and tools are stowed and secured in accordance with safe work procedures
  • EWP is operated using all movements in accordance with safe work procedures and manufacturer requirements
  • Unplanned and unsafe situations are responded to in accordance with safe work procedures
  • All communication signals are correctly interpreted and followed whilst EWP is operated in accordance with safe work procedures
  • EWP platform is accessed and egressed in accordance with safe work procedures and manufacturer requirements
  • EWP is parked, switched off and isolated appropriately in accordance with manufacturer requirements and safe work procedures
  • Post-operational EWP checks are carried out in accordance with manufacturer requirements and safe work procedures
  • EWP boom is retracted, lowered, stowed and secured in accordance with manufacturer requirements and safe work procedures
  • Safety equipment and PPE is disconnected from platform in accordance with safe work procedures
  • Relevant motion locks and brakes are applied as required in accordance with manufacturer requirements and safe work procedures
  • Outriggers and/or stabilisers, plates or packing if fitted are stowed and secured in accordance and with manufacturer requirements and safe work procedures
  • EWP is shut down in accordance with manufacturer requirements and safe work procedures
  • Task requirements are identified from work orders or equivalent and confirmed with relevant people and a site inspection is completed in accordance with workplace procedures
       
Element: Work area ground/operating surface is assessed to determine suitability for operational use of EWP in accordance with manufacturer requirements and workplace procedures
       
Element: EWP capabilities are established for the load/s and work/task requirements in accordance with manufacturer requirements and workplace procedures
       
Element: Appropriate paths for operating the EWP and moving in work area are assessed and determined in accordance with workplace procedures
       
Element: Relevant hazard and risk control measures are applied and advised to relevant person/s in accordance with workplace procedures
       
Element: Traffic management plan implementation is confirmed in accordance with workplace procedures
       
Element: Appropriate communication procedures are identified, with relevant people in accordance with workplace procedures
       
Element: All work is confirmed to ensure coverage of work/task requirements for the relevant work area in accordance with workplace procedures
  • Consultation with workplace person/s is maintained to ensure workplan is clear and consistent with site requirements in accordance with workplace procedures
       
Element: Risk control measures for hazards identified are checked for implementation in accordance with workplace procedures
       
Element: Safety equipment including Personal Protective Equipment (PPE) are inspected, fitted correctly and used in accordance with manufacturer requirements and safe work procedures
       
Element: EWP is accessed in a safe manner in accordance with manufacturer requirements and safe work procedures
       
Element: Pre-start EWP checks are carried out in accordance with manufacturers requirements and safe work procedures
       
Element: EWP is started and is checked for any abnormal noises in accordance safe work procedures
       
Element: EWP is positioned correctly as per work plan in work area in accordance with relevant manufacturer requirements and safe work procedures
       
Element: EWP is stabilised appropriately in accordance with the workplan, relevant manufacturer requirements and safe work procedures
       
Element: Operational checks from base controls are carried out in accordance with relevant manufacturer requirements and safe work procedures
       
Element: All platform controls are located, identified and tested in accordance with manufacturer requirements and safe work procedures
       
Element: All damage and defects are reported and appropriate action is taken to rectify in accordance with manufacturer requirements and safe work procedures
       
Element: EWP logbook is inspected and is correct for the EWP, is completed and signed in accordance with manufacturer requirements and safe work procedures
       
Element: Weather and work environmental conditions are assessed to determine any impact on EWP operation and positioning as per workplan in accordance with manufacturer requirements and safe work procedures
  • Relevant hazard prevention/control measures identified are checked for implementation in accordance with safe work procedures
       
Element: EWP is safely located at point of work in work area in accordance with safe work procedures
       
Element: EWP platform is positioned for work tasks and stability and all operations are monitored constantly in accordance with safe work procedures
       
Element: Work gear and tools are stowed and secured in accordance with safe work procedures
       
Element: EWP is operated using all movements in accordance with safe work procedures and manufacturer requirements
       
Element: Unplanned and unsafe situations are responded to in accordance with safe work procedures
       
Element: All communication signals are correctly interpreted and followed whilst EWP is operated in accordance with safe work procedures
       
Element: EWP platform is accessed and egressed in accordance with safe work procedures and manufacturer requirements
       
Element: EWP is parked, switched off and isolated appropriately in accordance with manufacturer requirements and safe work procedures
  • Post-operational EWP checks are carried out in accordance with manufacturer requirements and safe work procedures
       
Element: EWP boom is retracted, lowered, stowed and secured in accordance with manufacturer requirements and safe work procedures
       
Element: Safety equipment and PPE is disconnected from platform in accordance with safe work procedures
       
Element: Relevant motion locks and brakes are applied as required in accordance with manufacturer requirements and safe work procedures
       
Element: Outriggers and/or stabilisers, plates or packing if fitted are stowed and secured in accordance and with manufacturer requirements and safe work procedures
       
Element: EWP is shut down in accordance with manufacturer requirements and safe work procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Task requirements are identified from work orders or equivalent and confirmed with relevant people and a site inspection is completed in accordance with workplace procedures 
Work area ground/operating surface is assessed to determine suitability for operational use of EWP in accordance with manufacturer requirements and workplace procedures 
EWP capabilities are established for the load/s and work/task requirements in accordance with manufacturer requirements and workplace procedures 
Appropriate paths for operating the EWP and moving in work area are assessed and determined in accordance with workplace procedures 
Relevant hazard and risk control measures are applied and advised to relevant person/s in accordance with workplace procedures 
Traffic management plan implementation is confirmed in accordance with workplace procedures 
Appropriate communication procedures are identified, with relevant people in accordance with workplace procedures 
All work is confirmed to ensure coverage of work/task requirements for the relevant work area in accordance with workplace procedures 
Consultation with workplace person/s is maintained to ensure workplan is clear and consistent with site requirements in accordance with workplace procedures 
Risk control measures for hazards identified are checked for implementation in accordance with workplace procedures 
Safety equipment including Personal Protective Equipment (PPE) are inspected, fitted correctly and used in accordance with manufacturer requirements and safe work procedures 
EWP is accessed in a safe manner in accordance with manufacturer requirements and safe work procedures 
Pre-start EWP checks are carried out in accordance with manufacturers requirements and safe work procedures 
EWP is started and is checked for any abnormal noises in accordance safe work procedures 
EWP is positioned correctly as per work plan in work area in accordance with relevant manufacturer requirements and safe work procedures 
EWP is stabilised appropriately in accordance with the workplan, relevant manufacturer requirements and safe work procedures 
Operational checks from base controls are carried out in accordance with relevant manufacturer requirements and safe work procedures 
All platform controls are located, identified and tested in accordance with manufacturer requirements and safe work procedures 
All damage and defects are reported and appropriate action is taken to rectify in accordance with manufacturer requirements and safe work procedures 
EWP logbook is inspected and is correct for the EWP, is completed and signed in accordance with manufacturer requirements and safe work procedures 
Weather and work environmental conditions are assessed to determine any impact on EWP operation and positioning as per workplan in accordance with manufacturer requirements and safe work procedures 
Relevant hazard prevention/control measures identified are checked for implementation in accordance with safe work procedures 
EWP is safely located at point of work in work area in accordance with safe work procedures 
EWP platform is positioned for work tasks and stability and all operations are monitored constantly in accordance with safe work procedures 
Work gear and tools are stowed and secured in accordance with safe work procedures 
EWP is operated using all movements in accordance with safe work procedures and manufacturer requirements 
Unplanned and unsafe situations are responded to in accordance with safe work procedures 
All communication signals are correctly interpreted and followed whilst EWP is operated in accordance with safe work procedures 
EWP platform is accessed and egressed in accordance with safe work procedures and manufacturer requirements 
EWP is parked, switched off and isolated appropriately in accordance with manufacturer requirements and safe work procedures 
Post-operational EWP checks are carried out in accordance with manufacturer requirements and safe work procedures 
EWP boom is retracted, lowered, stowed and secured in accordance with manufacturer requirements and safe work procedures 
Safety equipment and PPE is disconnected from platform in accordance with safe work procedures 
Relevant motion locks and brakes are applied as required in accordance with manufacturer requirements and safe work procedures 
Outriggers and/or stabilisers, plates or packing if fitted are stowed and secured in accordance and with manufacturer requirements and safe work procedures 
EWP is shut down in accordance with manufacturer requirements and safe work procedures 
Task requirements are identified from work orders or equivalent and confirmed with relevant people and a site inspection is completed in accordance with workplace procedures 
 
 
 
 
 
 
Consultation with workplace person/s is maintained to ensure workplan is clear and consistent with site requirements in accordance with workplace procedures 
 
 
 
 
 
 
 
 
 
 
 
Relevant hazard prevention/control measures identified are checked for implementation in accordance with safe work procedures 
 
 
 
 
 
 
 
Post-operational EWP checks are carried out in accordance with manufacturer requirements and safe work procedures 
 
 
 
 
 

Forms

Assessment Cover Sheet

TLILIC0005 - Licence to operate a boom-type elevating work platform (boom length 11 metres or more)
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

TLILIC0005 - Licence to operate a boom-type elevating work platform (boom length 11 metres or more)

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: