Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

TLILIC0014 Mapping and Delivery Guide
Licence to operate a slewing mobile crane (up to 100 Tonnes)

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency TLILIC0014 - Licence to operate a slewing mobile crane (up to 100 Tonnes)
Description
Employability Skills
Learning Outcomes and Application This unit specifies the skills and knowledge required to safely operate a slewing mobile crane with a Maximum Rated Capacity (MRC) up to 100 tonnes, in accordance with all relevant legislative responsibilities. Competence in this unit, does not in itself result in a High-Risk Work Licence (HRWL) to operate this plant.A person undertaking this unit must hold: a current National HRWL to perform dogging or a certification for a specific VET course for HRWL to perform dogginga current National HRWL to operate a Slewing Mobile crane (up to 60 Tonnes), and current industry experience operating a slewing mobile crane of between 20t and up to 60t competently for at least 2 years.Slewing mobile crane means a mobile crane incorporating a boom or jib that can be slewed, but does not include:a front-end loader ora backhoe oran excavator orother earth moving equipment, when configured for crane operation.A person performing this work is required to hold a slewing mobile crane with an MRC up to 100 tonnes HRWL.This unit requires a person operating a slewing mobile crane with an MRC up to 100 tonnes to:plan for the work/taskprepare for the work/taskperform work/task pack upLicensing/Regulatory InformationLegislative and regulatory requirements are applicable to this unit of competency. This unit is based on the licensing requirements of Part 4.5 of the Model Work Health and Safety (WHS) Regulations and meets Commonwealth, State and Territory HRWL requirements. The National Assessment Instrument (NAI) is the mandated assessment for the HRWL to operate the relevant licencing class as detailed in this unit.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field LIC - Licencing Units
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan work/task
  • Task requirements are identified from work orders or equivalent and a lift plan is confirmed with associated personnel and a site inspection is conducted in accordance with workplace procedures
  • Work area operating surface is confirmed to determine the quality of ground suitability for operational use of mobile crane in accordance with workplace procedures
  • Mobile crane rated capacity (RC) and the lifting gear Working Load Limit (WLL)are established for the load/s and work/task requirements in accordance with manufacturer requirements and workplace procedures
  • Appropriate paths for operating the mobile crane and moving and placing load/s in work area are assessed and determined in accordance with workplace procedures
  • Relevant hazard identification and risk elimination/control measures are applied and advised to associated personnel in accordance with workplace procedures
  • Traffic management plan implementation is confirmed and followed in accordance with workplace procedures
  • Appropriate communication procedures are identified and tested with associated personnel in accordance with workplace procedures
  • All tasks are confirmed to ensure requirements for the relevant work area in accordance with a lift plan and workplace procedures
       
Element: Prepare for work/task
  • Consultation with workplace personnel is established and maintained to ensure lift plan is clear and consistent with site requirements in accordance with a lift plan and workplace procedures
  • Risk control measures for hazards identified are checked for implementation in accordance with the lift plan and safe work procedures
  • Mobile crane is accessed safely in accordance with manufacturer requirements and safe work procedures
  • Pre-start mobile crane checks are carried out and any damage and defects are reported, recorded and appropriate action is taken in accordance with manufacturer requirements and safe work procedures
  • Mobile crane is set up correctly with any lifting gear and stabilised as per the lift plan in accordance with relevant manufacturer requirements including load chart/s and safe work procedures
  • Counterweight/s are set up as required in accordance with the lift plan, relevant manufacturer requirements and safe work procedures
  • Fly jib and/or luffing fly are set up as required in accordance with specific manufacturer requirements and safe work procedures
  • Operational checks are carried out and any damage and defects are reported, recorded and appropriate action is taken in accordance with manufacturer requirements and safe work procedures
  • Crane logbook is checked to confirm current compliance, is correct for the crane type, is completed and signed and required rectifications have been signed off in accordance with manufacturer requirements and safe work procedures
  • Weather and work environment conditions are assessed to determine any impact on mobile crane operations in accordance with manufacturer requirements and safe work procedures
       
Element: Perform work/task
  • Lifts are determined within the RC of the mobile crane in accordance with the load chart/s and lift plan
  • Boom/jib and hook block is safely positioned over the load following directions from associated personnel in accordance with the lift plan and safe work procedures
  • Main and/or auxiliary hook including any lifting gear, where required are connected to the load and used safely in accordance with the lift plan, safe work procedures and manufacturer requirements
  • Test lift is carried out in accordance with dogging and safe work procedures
  • Loads are transferred using relevant crane movements and tag lines as required, in accordance with lift plan and safe work procedures
  • Load and crane movement is monitored constantly and crane is operated safely in accordance with lift plan and safe work procedures
  • All required communication signals are correctly interpreted and followed whilst crane is operated in accordance with the lift plan and safe work procedures
  • Load is lowered and landed safely in accordance with lift plan and safe work procedures
  • Lifting gear is disconnected from load and crane is positioned safely and efficiently for next task in accordance with lift plan and safe work procedures
  • Crane boom/jib, lifting gear and associated equipment is stowed and secured as required in accordance with manufacturer requirements and safe work procedures
  • Crane fly jib and counterweight is removed to storage position and secured as required in accordance with manufacturer requirements and safe work procedures
  • Relevant motion locks and brakes are applied as required in accordance with manufacturer requirements and safe work procedures
  • Outriggers are stowed and secured in accordance with manufacturer requirements and safe work procedures
  • Crane is shut down and secured to prevent unauthorised access/use in accordance with safe work procedures
  • Plates or packing are stowed and secured in accordance with safe work procedures
  • Shut down crane checks are carried out in accordance with safe work procedures and manufacturer requirements
  • Task requirements are identified from work orders or equivalent and a lift plan is confirmed with associated personnel and a site inspection is conducted in accordance with workplace procedures
       
Element: Work area operating surface is confirmed to determine the quality of ground suitability for operational use of mobile crane in accordance with workplace procedures
       
Element: Mobile crane rated capacity (RC) and the lifting gear Working Load Limit (WLL)are established for the load/s and work/task requirements in accordance with manufacturer requirements and workplace procedures
       
Element: Appropriate paths for operating the mobile crane and moving and placing load/s in work area are assessed and determined in accordance with workplace procedures
       
Element: Relevant hazard identification and risk elimination/control measures are applied and advised to associated personnel in accordance with workplace procedures
       
Element: Traffic management plan implementation is confirmed and followed in accordance with workplace procedures
       
Element: Appropriate communication procedures are identified and tested with associated personnel in accordance with workplace procedures
       
Element: All tasks are confirmed to ensure requirements for the relevant work area in accordance with a lift plan and workplace procedures
  • Consultation with workplace personnel is established and maintained to ensure lift plan is clear and consistent with site requirements in accordance with a lift plan and workplace procedures
       
Element: Risk control measures for hazards identified are checked for implementation in accordance with the lift plan and safe work procedures
       
Element: Mobile crane is accessed safely in accordance with manufacturer requirements and safe work procedures
       
Element: Pre-start mobile crane checks are carried out and any damage and defects are reported, recorded and appropriate action is taken in accordance with manufacturer requirements and safe work procedures
       
Element: Mobile crane is set up correctly with any lifting gear and stabilised as per the lift plan in accordance with relevant manufacturer requirements including load chart/s and safe work procedures
       
Element: Counterweight/s are set up as required in accordance with the lift plan, relevant manufacturer requirements and safe work procedures
       
Element: Fly jib and/or luffing fly are set up as required in accordance with specific manufacturer requirements and safe work procedures
       
Element: Operational checks are carried out and any damage and defects are reported, recorded and appropriate action is taken in accordance with manufacturer requirements and safe work procedures
       
Element: Crane logbook is checked to confirm current compliance, is correct for the crane type, is completed and signed and required rectifications have been signed off in accordance with manufacturer requirements and safe work procedures
       
Element: Weather and work environment conditions are assessed to determine any impact on mobile crane operations in accordance with manufacturer requirements and safe work procedures
  • Lifts are determined within the RC of the mobile crane in accordance with the load chart/s and lift plan
       
Element: Boom/jib and hook block is safely positioned over the load following directions from associated personnel in accordance with the lift plan and safe work procedures
       
Element: Main and/or auxiliary hook including any lifting gear, where required are connected to the load and used safely in accordance with the lift plan, safe work procedures and manufacturer requirements
       
Element: Test lift is carried out in accordance with dogging and safe work procedures
       
Element: Loads are transferred using relevant crane movements and tag lines as required, in accordance with lift plan and safe work procedures
       
Element: Load and crane movement is monitored constantly and crane is operated safely in accordance with lift plan and safe work procedures
       
Element: All required communication signals are correctly interpreted and followed whilst crane is operated in accordance with the lift plan and safe work procedures
       
Element: Load is lowered and landed safely in accordance with lift plan and safe work procedures
       
Element: Lifting gear is disconnected from load and crane is positioned safely and efficiently for next task in accordance with lift plan and safe work procedures
  • Crane boom/jib, lifting gear and associated equipment is stowed and secured as required in accordance with manufacturer requirements and safe work procedures
       
Element: Crane fly jib and counterweight is removed to storage position and secured as required in accordance with manufacturer requirements and safe work procedures
       
Element: Relevant motion locks and brakes are applied as required in accordance with manufacturer requirements and safe work procedures
       
Element: Outriggers are stowed and secured in accordance with manufacturer requirements and safe work procedures
       
Element: Crane is shut down and secured to prevent unauthorised access/use in accordance with safe work procedures
       
Element: Plates or packing are stowed and secured in accordance with safe work procedures
       
Element: Shut down crane checks are carried out in accordance with safe work procedures and manufacturer requirements
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non -essential conditions may be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Task requirements are identified from work orders or equivalent and a lift plan is confirmed with associated personnel and a site inspection is conducted in accordance with workplace procedures 
Work area operating surface is confirmed to determine the quality of ground suitability for operational use of mobile crane in accordance with workplace procedures 
Mobile crane rated capacity (RC) and the lifting gear Working Load Limit (WLL)are established for the load/s and work/task requirements in accordance with manufacturer requirements and workplace procedures 
Appropriate paths for operating the mobile crane and moving and placing load/s in work area are assessed and determined in accordance with workplace procedures 
Relevant hazard identification and risk elimination/control measures are applied and advised to associated personnel in accordance with workplace procedures 
Traffic management plan implementation is confirmed and followed in accordance with workplace procedures 
Appropriate communication procedures are identified and tested with associated personnel in accordance with workplace procedures 
All tasks are confirmed to ensure requirements for the relevant work area in accordance with a lift plan and workplace procedures 
Consultation with workplace personnel is established and maintained to ensure lift plan is clear and consistent with site requirements in accordance with a lift plan and workplace procedures 
Risk control measures for hazards identified are checked for implementation in accordance with the lift plan and safe work procedures 
Mobile crane is accessed safely in accordance with manufacturer requirements and safe work procedures 
Pre-start mobile crane checks are carried out and any damage and defects are reported, recorded and appropriate action is taken in accordance with manufacturer requirements and safe work procedures 
Mobile crane is set up correctly with any lifting gear and stabilised as per the lift plan in accordance with relevant manufacturer requirements including load chart/s and safe work procedures 
Counterweight/s are set up as required in accordance with the lift plan, relevant manufacturer requirements and safe work procedures 
Fly jib and/or luffing fly are set up as required in accordance with specific manufacturer requirements and safe work procedures 
Operational checks are carried out and any damage and defects are reported, recorded and appropriate action is taken in accordance with manufacturer requirements and safe work procedures 
Crane logbook is checked to confirm current compliance, is correct for the crane type, is completed and signed and required rectifications have been signed off in accordance with manufacturer requirements and safe work procedures 
Weather and work environment conditions are assessed to determine any impact on mobile crane operations in accordance with manufacturer requirements and safe work procedures 
Lifts are determined within the RC of the mobile crane in accordance with the load chart/s and lift plan 
Boom/jib and hook block is safely positioned over the load following directions from associated personnel in accordance with the lift plan and safe work procedures 
Main and/or auxiliary hook including any lifting gear, where required are connected to the load and used safely in accordance with the lift plan, safe work procedures and manufacturer requirements 
Test lift is carried out in accordance with dogging and safe work procedures 
Loads are transferred using relevant crane movements and tag lines as required, in accordance with lift plan and safe work procedures 
Load and crane movement is monitored constantly and crane is operated safely in accordance with lift plan and safe work procedures 
All required communication signals are correctly interpreted and followed whilst crane is operated in accordance with the lift plan and safe work procedures 
Load is lowered and landed safely in accordance with lift plan and safe work procedures 
Lifting gear is disconnected from load and crane is positioned safely and efficiently for next task in accordance with lift plan and safe work procedures 
Crane boom/jib, lifting gear and associated equipment is stowed and secured as required in accordance with manufacturer requirements and safe work procedures 
Crane fly jib and counterweight is removed to storage position and secured as required in accordance with manufacturer requirements and safe work procedures 
Relevant motion locks and brakes are applied as required in accordance with manufacturer requirements and safe work procedures 
Outriggers are stowed and secured in accordance with manufacturer requirements and safe work procedures 
Crane is shut down and secured to prevent unauthorised access/use in accordance with safe work procedures 
Plates or packing are stowed and secured in accordance with safe work procedures 
Shut down crane checks are carried out in accordance with safe work procedures and manufacturer requirements 
Task requirements are identified from work orders or equivalent and a lift plan is confirmed with associated personnel and a site inspection is conducted in accordance with workplace procedures 
 
 
 
 
 
 
Consultation with workplace personnel is established and maintained to ensure lift plan is clear and consistent with site requirements in accordance with a lift plan and workplace procedures 
 
 
 
 
 
 
 
 
Lifts are determined within the RC of the mobile crane in accordance with the load chart/s and lift plan 
 
 
 
 
 
 
 
Crane boom/jib, lifting gear and associated equipment is stowed and secured as required in accordance with manufacturer requirements and safe work procedures 
 
 
 
 
 
 

Forms

Assessment Cover Sheet

TLILIC0014 - Licence to operate a slewing mobile crane (up to 100 Tonnes)
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

TLILIC0014 - Licence to operate a slewing mobile crane (up to 100 Tonnes)

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: