Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
TLIS2034 Mapping and Delivery Guide
Install and repair rail fastening systems
Version 1.0
Issue Date: June 2024
Qualification | - |
Unit of Competency | TLIS2034 - Install and repair rail fastening systems | |
---|---|---|---|---|
Description | ||||
Employability Skills | ||||
Learning Outcomes and Application | This unit involves the skills and knowledge required to install and repair rail fastening systems in accordance with safeworking and regulatory requirements, and workplace procedures.It includes identifying work requirements, installing the fastening system, repairing the fastening system and completing all required documentation.People achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice and/or guidelines.Work is performed under some supervision, generally within a team environment. It involves the application of routine operational principles and procedures when installing and repairing rail fastening systems, as part of workplace activities across a variety of operational contexts within the Australian rail system.Operators of mechanised equipment must have undertaken training and, where appropriate, hold the relevant licence, permit or certificate and be recognised as competent for the class of machinery being used.No licensing, legislative or certification requirements apply to this unit at the time of publication. | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
|
|||
Prerequisites/co-requisites | ||||
Competency Field | S – Construction and Installation |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare for work | ||||||||
Element: Worksite is identified to confirm work requirements | ||||||||
Element: Appropriate fastening system is chosen to suit job requirements | ||||||||
Element: Hazards are identified, risks are assessed and control measures are implemented | ||||||||
Element: Appropriate tools and equipment are selected for job to facilitate the effective replacement/repair of components | ||||||||
Element: Install fastening system | ||||||||
Element: Required rail industry standards for installing fastening systems are confirmed | ||||||||
Element: Selected fastening systems are installed using appropriate tools and equipment in accordance with rail industry standards | ||||||||
Element: Tools and equipment are stored after use | ||||||||
Element: Repair fastening system | ||||||||
Element: Appropriate method is chosen to repair fastening system | ||||||||
Element: Required standards for repairing fastening systems are confirmed | ||||||||
Element: Fastening systems are repaired to maintain integrity of rail fastening systems in accordance with rail industry standards | ||||||||
Element: Complete documentation | ||||||||
Element: Required documentation procedures and processes are confirmed | ||||||||
Element: Documentation is filled in legibly and proofread | ||||||||
Element: Documentation is processed in accordance with workplace requirements |