TLIS3009 Mapping and Delivery Guide
Install mechanical signalling locking and interlocking devices
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | TLIS3009 - Install mechanical signalling locking and interlocking devices | |
---|---|---|---|---|
Description | ||||
Employability Skills | ||||
Learning Outcomes and Application | This unit involves the skills and knowledge required to install mechanical signalling locking and interlocking devices in accordance with safeworking and regulatory requirements, and workplace proceduresIt includes assembling components, installing equipment and components to specifications, and testing and adjusting equipment in accordance with workplace procedures.People achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice and/or guidelines.Work is performed under minimal supervision, generally within a team environment.It involves the application of routine operational principles and procedures when installing mechanical signalling locking and interlocking devices, as part of workplace activities across a variety of operational contexts within the Australian rail system.No licensing, legislative or certification requirements apply to this unit at the time of publication. | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
|
|||
Prerequisites/co-requisites | ||||
Competency Field | S – Construction and Installation |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Assemble components | ||||||||
Element: Correct components are identified and selected to comply with job specifications | ||||||||
Element: Hazards are identified, risks are assessed and control measures are implemented | ||||||||
Element: Equipment and components are pre-assembled and positioned for installation in compliance with work orders and job specifications | ||||||||
Element: Install equipment and components | ||||||||
Element: Equipment/component layout is prepared and checked to ensure position matches job specifications | ||||||||
Element: All fastening positions are marked and drilled for installation | ||||||||
Element: Equipment and components are secured in correct sequence and position in compliance with job specifications | ||||||||
Element: Additional requirements or alterations to existing components are identified and appropriate follow-up action is taken | ||||||||
Element: Manufacturing of additional components is carried out to allow for complete installation | ||||||||
Element: Alterations to existing components are carried out to provide for the installation of new equipment | ||||||||
Element: All interlinking components are correctly attached and secured ready for testing in compliance with work specifications | ||||||||
Element: Test and adjust equipment | ||||||||
Element: Required authorisation for tests is confirmed to ensure safe train operations may continue | ||||||||
Element: Test procedures are coordinated and liaison with appropriate personnel is maintained to ensure overall safety | ||||||||
Element: Appropriate tests are carried out to ensure all operations are within specifications and appropriate adjustments are made to ensure smooth operation | ||||||||
Element: Testing is carried out to ensure functionality of all operations to the locking table | ||||||||
Element: Operational readiness is confirmed and required documentation/certification is correctly completed and processed to allow for commissioning |