Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

TLIW5002 Mapping and Delivery Guide
Manage rail assets and interfaces

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency TLIW5002 - Manage rail assets and interfaces
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to manage rail assets and interfaces, in accordance with workplace procedures and regulatory requirements.It includes managing rail infrastructure fixed assets and maintenance regimes; managing rail operation fixed assets and management regimes; applying reliability, availability, maintainability and safety of rail infrastructure; and managing wheel rail interface. This unit involves knowledge of rail assets in general terms. It covers the different rail infrastructure and operational components and can be applied to freight, heavy haul or passenger rail systems.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

As a minimum, assessors must satisfy applicable regulatory requirements, which include requirements in the Standards for Registered Training Organisations current at the time of assessment.

As a minimum, assessment must satisfy applicable regulatory requirements, which include requirements in the Standards for Registered Training Organisations current at the time of assessment.

Assessment must occur in rail workplace operational situations or, where this is not available, in simulated workplace operational situations that replicate rail workplace conditions.

Assessment processes and techniques must be appropriate to the language, literacy and numeracy requirements of the work being performed and the needs of the candidate.

Resources for assessment include:

a range of relevant exercises, case studies and/or simulations

relevant and appropriate materials, tools, equipment and personal protective equipment currently used in industry

applicable documentation including workplace procedures, regulations, rail industry standards, codes of practice and operation manuals.

Prerequisites/co-requisites
Competency Field W – Equipment and Systems Operations
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Manage rail infrastructure fixed assets and maintenance regimes
       
Element: Components and functions of track and track bed are identified and explained
       
Element: Electrical infrastructure components and functions are identified are explained
       
Element: Other fixed assets and their functions are identified and explained
       
Element: Hazards are identified, risks are assessed and control measures are implemented
       
Element: Organisational track inspection methodologies are identified, analysed and recommendations for improvement are made to management as required
       
Element: Inspection and maintenance regimes for other assets are identified, analysed and recommendations for improvement are made to management as required
       
Element: Manage rail operation fixed assets and management regimes
       
Element: Rail operation assets and their individual life cycles are identified and explained
       
Element: Asset maintenance plans are identified, accessed and implemented
       
Element: Processes to monitor asset utilisation and their effectiveness in meeting operational needs are identified and followed
       
Element: Potential conflict between operational asset utilisation and maintenance requirements are identified, explained and managed
       
Element: Organisational technologies and processes that could enhance asset utilisation are identified, analysed and recommended to management
       
Element: Inspection and maintenance regimes for other assets are identified and analysed
       
Element: Apply reliability, availability, maintainability and safety of rail infrastructure
       
Element: Concepts related to rail infrastructure reliability, availability, maintainability and safety (RAMS) are identified and explained
       
Element: Risk assessment is undertaken in relation to rail infrastructure RAMS
       
Element: Programs are developed and implemented to ensure rail infrastructure RAMS are applied
       
Element: Impacts of safety requirements on rail network are identified, explained and taken into consideration
       
Element: Manage wheel rail interface
       
Element: Wheel rail interface is identified and explained
       
Element: Defects and problems related to wheel rail interface are anticipated and rectified, and preventative programs are developed and implemented
       
Element: Impacts of poor management of wheel rail interface are identified and explained
       
Element: Damage that can be caused by poor wheel rail interface is identified and explained
       
Element: Methods for measuring and maintaining rail profiles are identified and applied
       
Element: Methods for maintaining rolling stock wheels are identified and applied
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Manage rail infrastructure fixed assets and maintenance regimes

1.1

Components and functions of track and track bed are identified and explained

1.2

Electrical infrastructure components and functions are identified are explained

1.3

Other fixed assets and their functions are identified and explained

1.4

Hazards are identified, risks are assessed and control measures are implemented

1.5

Organisational track inspection methodologies are identified, analysed and recommendations for improvement are made to management as required

1.6

Inspection and maintenance regimes for other assets are identified, analysed and recommendations for improvement are made to management as required

2

Manage rail operation fixed assets and management regimes

2.1

Rail operation assets and their individual life cycles are identified and explained

2.2

Asset maintenance plans are identified, accessed and implemented

2.3

Processes to monitor asset utilisation and their effectiveness in meeting operational needs are identified and followed

2.4

Potential conflict between operational asset utilisation and maintenance requirements are identified, explained and managed

2.5

Organisational technologies and processes that could enhance asset utilisation are identified, analysed and recommended to management

2.6

Inspection and maintenance regimes for other assets are identified and analysed

3

Apply reliability, availability, maintainability and safety of rail infrastructure

3.1

Concepts related to rail infrastructure reliability, availability, maintainability and safety (RAMS) are identified and explained

3.2

Risk assessment is undertaken in relation to rail infrastructure RAMS

3.3

Programs are developed and implemented to ensure rail infrastructure RAMS are applied

3.4

Impacts of safety requirements on rail network are identified, explained and taken into consideration

4

Manage wheel rail interface

4.1

Wheel rail interface is identified and explained

4.2

Defects and problems related to wheel rail interface are anticipated and rectified, and preventative programs are developed and implemented

4.3

Impacts of poor management of wheel rail interface are identified and explained

4.4

Damage that can be caused by poor wheel rail interface is identified and explained

4.5

Methods for measuring and maintaining rail profiles are identified and applied

4.6

Methods for maintaining rolling stock wheels are identified and applied

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least one occasion and include:

accessing and using rail safety industry standards

applying relevant safeworking and workplace procedures

communicating effectively with others and interpreting complex information relating to rail operations

identifying job hazards and taking required action to minimise, control or eliminate identified hazards

managing rail infrastructure fixed assets and maintenance regimes to ensure reliability, availability, maintainability and safety (RAMS) of rail infrastructure assets

managing rail operation fixed assets and maintenance regimes to ensure RAMS of rail operations assets

managing wheel rail data and interface.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

asset management policy and processes that address all phases of the asset life cycle of the rail infrastructure or operations

duty holders and their duties under rail safety legislation

key concepts and definitions relating to rail assets and interfaces

key principles and practices associated with railway operations

key rail industry regulatory requirements and standards

rail industry and rail industry terminology, including terminology used in rail industry standards

rail infrastructure reliability, availability, maintainability and safety (RAMS) concepts

rail regulatory framework

rail safety management systems (SMSs)

relevance of standards to the rail industry

relevant information to manage rail assets and interfaces.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Manage rail infrastructure fixed assets and maintenance regimes

1.1

Components and functions of track and track bed are identified and explained

1.2

Electrical infrastructure components and functions are identified are explained

1.3

Other fixed assets and their functions are identified and explained

1.4

Hazards are identified, risks are assessed and control measures are implemented

1.5

Organisational track inspection methodologies are identified, analysed and recommendations for improvement are made to management as required

1.6

Inspection and maintenance regimes for other assets are identified, analysed and recommendations for improvement are made to management as required

2

Manage rail operation fixed assets and management regimes

2.1

Rail operation assets and their individual life cycles are identified and explained

2.2

Asset maintenance plans are identified, accessed and implemented

2.3

Processes to monitor asset utilisation and their effectiveness in meeting operational needs are identified and followed

2.4

Potential conflict between operational asset utilisation and maintenance requirements are identified, explained and managed

2.5

Organisational technologies and processes that could enhance asset utilisation are identified, analysed and recommended to management

2.6

Inspection and maintenance regimes for other assets are identified and analysed

3

Apply reliability, availability, maintainability and safety of rail infrastructure

3.1

Concepts related to rail infrastructure reliability, availability, maintainability and safety (RAMS) are identified and explained

3.2

Risk assessment is undertaken in relation to rail infrastructure RAMS

3.3

Programs are developed and implemented to ensure rail infrastructure RAMS are applied

3.4

Impacts of safety requirements on rail network are identified, explained and taken into consideration

4

Manage wheel rail interface

4.1

Wheel rail interface is identified and explained

4.2

Defects and problems related to wheel rail interface are anticipated and rectified, and preventative programs are developed and implemented

4.3

Impacts of poor management of wheel rail interface are identified and explained

4.4

Damage that can be caused by poor wheel rail interface is identified and explained

4.5

Methods for measuring and maintaining rail profiles are identified and applied

4.6

Methods for maintaining rolling stock wheels are identified and applied

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions can be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Forms

Assessment Cover Sheet

TLIW5002 - Manage rail assets and interfaces
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

TLIW5002 - Manage rail assets and interfaces

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: