Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEEEC0039 Mapping and Delivery Guide
Install and test microwave antennae and waveguides
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEEEC0039 - Install and test microwave antennae and waveguides | |
---|---|---|---|---|
Description | ||||
Employability Skills | ||||
Learning Outcomes and Application | This unit involves the skills and knowledge required to install and test microwave antennae and waveguides.It includes preparing to install and test microwave antennae and waveguides, installing microwave antennae and waveguides, testing microwave antennae and waveguides, and reporting outcomes.Permits may be required for some work environments, such as confined spaces, working aloft, near live electrical apparatus and site rehabilitation.No licensing, legislative or certification requirements apply to this unit at the time of publication. | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
|
|||
Prerequisites/co-requisites | ||||
Competency Field | Electronics and Communications |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to install and test microwave antennae and waveguides |
| |||||||
Element: Risk control measures are applied in accordance with workplace procedures prior to commencing work | ||||||||
Element: Risks/hazards are identified, assessed and reported to relevant person/s, and control measures implemented | ||||||||
Element: Nature and location of the work is obtained from relevant person/s to determine scope of work | ||||||||
Element: Instructions for coordinating work with others are obtained from relevant person/s and applied | ||||||||
Element: Materials required for the work are determined in accordance with workplace procedures | ||||||||
Element: Tools, equipment and testing devices required for work are obtained in accordance with workplace procedures and checked for correct operation and safety | ||||||||
Element: Install microwave antennae and waveguides |
| |||||||
Element: Circuits/components are checked and isolated, as required, in accordance with WHS/OHS requirements and workplace procedures | ||||||||
Element: Antennas are installed in specified locations and within limitations imposed by regulations | ||||||||
Element: Hardware and accessories are installed straight and square in the required locations and within acceptable tolerances | ||||||||
Element: Cables and conductors are terminated at accessories in accordance with relevant industry standards, manufacturer instructions and job specifications | ||||||||
Element: Unplanned events are referred to relevant person/s in accordance with workplace procedures | ||||||||
Element: Installation is conducted efficiently, without waste of materials, damage to apparatus circuits or the surrounding environment applying sustainable energy practices | ||||||||
Element: Test microwave antennae and waveguides and report |
| |||||||
Element: Pre-commissioning adjustments are made to the installation and the system to optimise performance in accordance with system specifications | ||||||||
Element: Worksite is cleaned and made safe in accordance with workplace procedures | ||||||||
Element: Relevant person/s is notified of installation completion in accordance with workplace procedures |