Install and test computer based interlocking equipment
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEENEEN013B - Install and test computer based interlocking equipment |
---|---|---|---|
Description | 1) 1.1) This unit covers installation and testing of computer based interlocking equipment for rail network signalling. It encompasses safe working, regulatory requirements and following installation specifications, installing computer equipment, associated electronic equipment and track side interfaces, pre-commissioning activities, operational testing and reporting. | ||
Employability Skills | 3)This unit contains Employability SkillsThe required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements. | ||
Learning Outcomes and Application | 4) This unit shall apply to qualifications in installation and maintenance of rail signalling electrical power and control systems. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Prerequisite Unit(s) 2) 2.1) CompetenciesRelevant work place requirements in 'Work site protection' have been acquired. | ||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to install and test computer based interlocking equipment |
| |||||||
Element: Install interlocking computers and computer data and communication link equipment. |
| |||||||
Element: Install trackside interfaces |
| |||||||
Element: Conduct pre-commissioning power-up checks |
| |||||||
Element: Test computer based interlocking equipment operations |
| |||||||
Element: Document installation and testing completion work |
|