Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEENEEN014B Mapping and Delivery Guide
Maintain computer based and solid state interlocking systems
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEENEEN014B - Maintain computer based and solid state interlocking systems |
---|---|---|---|
Description | 1) 1.1) This unit covers maintenance and repair of faults in computer based electronic equipment for rail network signalling system. It encompasses safe working, regulatory requirements and following work procedures monitoring system, responding to fault information, and replacing faulty equipment.. | ||
Employability Skills | 3)This unit contains Employability SkillsThe required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements. | ||
Learning Outcomes and Application | 4) This unit shall apply to qualifications in installation and maintenance of rail signalling electrical power and control systems. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Prerequisite Unit(s) 2) 2.1) CompetenciesRelevant work place requirements in 'Work site protection' have been acquired. | ||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to maintain computer based interlocking equipment |
| |||||||
Element: Monitor system and respond to fault information |
| |||||||
Element: Replace faulty equipment |
| |||||||
Element: Monitor and test equipment |
| |||||||
Element: Arrange repair of faulty equipment and report work activities |
|