Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEENEEN127A Mapping and Delivery Guide
Decommission electrical and electro-mechanical rail signalling from service
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEENEEN127A - Decommission electrical and electro-mechanical rail signalling from service |
---|---|---|---|
Description | 1)Scope:1.1) DescriptorThis unit covers the de-commissioning of electrical and electro-mechanical signalling systems from service on rail networks. It encompasses safe working, regulatory requirement work procedures, disconnection of operating and redundant circuitry, equipment and components, testing of remaining circuitry and equipment, finding and repairing faults, testing of control and indicating equipment and reporting. | ||
Employability Skills | 5) This unit contains Employability SkillsThe required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements. | ||
Learning Outcomes and Application | 2)This unit shall apply to qualifications in installation and maintenance of rail signalling electrical power and control systems. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Prerequisite Unit(s)4) Competencies4.1)Granting competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed.UEENEEN106A Install and maintain non-vital screen based rail control systemsUEENEEN110A Install and maintain non-vital telemetry systemsUEENEEN118A Find and repair rail signalling system faultsAnd Relevant work place requirements in ‘Work site protection’ have been acquired.For the full prerequisite chain details for this unit please refer to Table 2 in Volume 1, Part 2Literacy and numeracy skills4.2) Participants are best equipped to achieve competency in this unit if they have reading, writing and numeracy skills indicated by the following scales. Description of each scale is given in Volume 2, Part 3 ‘Literacy and Numeracy’Reading3Writing3Numeracy3 | ||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to decommission electrical and electro-mechanical rail signalling from service |
| |||||||
Element: Decommission electrical and electro-mechanical rail signalling from service |
| |||||||
Element: Complete decommissioning work and reports |
| |||||||
Element: System faults are identified and reported for follow-up action. | ||||||||
Element: Test results are documented in accordance with organisation requirements and faulty or replaced equipment is tagged and dispatched to maintain equipment spares. |