Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEERE0081 Mapping and Delivery Guide
Install photovoltaic systems to power conversion equipment
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEERE0081 - Install photovoltaic systems to power conversion equipment |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan to install PV power system |
| |||||||
Element: WHS/OHS processes and procedures for work are identified and applied in accordance with workplace procedures | ||||||||
Element: WHS/OHS hazards are identified, risks assessed, reported to relevant person/s and workplace procedures for risk control measures applied in preparation for work | ||||||||
Element: Work is planned in consultation with the customer and others impacted by the work and sequenced appropriately | ||||||||
Element: PV array mounting methods are verified in accordance with relevant industry standards | ||||||||
Element: Location of PV array components is verified within the constraints of the building structure, design and industry standards and regulations | ||||||||
Element: Material, tools, equipment and measuring devices required for the PV installation are obtained in accordance with workplace procedures and checked against relevant diagrams and job requirements prior to installation | ||||||||
Element: Live testing, measurement and isolation requirements determined and applied in accordance with WHS/OHS requirements and workplace procedures | ||||||||
Element: Install LV PV power array |
| |||||||
Element: PV array is installed in compliance with industry standards, regulations and job/manufacturer specifications, and with sufficient access to enable terminations, adjustment and maintenance | ||||||||
Element: Wiring is terminated at components and associated equipment in accordance with manufacturer specifications, and functional and regulatory requirements | ||||||||
Element: Quality checks of installed apparatus are conducted in accordance with workplace procedures | ||||||||
Element: Testing and commissioning of the system is conducted in accordance with design documentation, regulations, relevant industry standards and manufacturer specifications | ||||||||
Element: Worksite is cleaned and made safe in accordance with workplace procedures | ||||||||
Element: ‘As-installed’ system and associated equipment are documented, manuals produced, and system is handed over to required person/s as per legislation, regulations, industry standards and job requirements |