Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UEERS0024 Mapping and Delivery Guide
Install and maintain rail track circuit leads and bonds

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEERS0024 - Install and maintain rail track circuit leads and bonds
Description
Employability Skills
Learning Outcomes and Application
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to install/maintain track circuit leads and bonds
  • Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for work area are identified, obtained and applied
       
Element: Hazards are identified, risks assessed, and control measures and workplace procedures implemented
       
Element: Safety hazards that have not previously been identified are noted on job safety assessments and existing risk control measures implemented
       
Element: Any rails or cables with traction return current are identified and protection measures planned
       
Element: Missing or broken bonding cables are identified using track circuit bonding drawings
       
Element: Appropriate person/s is consulted to ensure work is coordinated effectively with others involved on the worksite
       
Element: Installation/maintenance instructions are reviewed to obtain clear and concise work requirements
       
Element: Site bonding layout plan is reviewed to clarify bonding requirements
       
Element: Material to install/maintain track circuit leads and bonds is obtained in accordance with workplace procedures and checked against job specifications
       
Element: Tools, equipment and testing devices to install/maintain track circuit leads and bonds are obtained in accordance with workplace procedures and checked for correct operation and safety
       
Element: Preparatory work is checked to ensure no unnecessary damage has occurred and complies with job specifications
       
Element: Install/maintain track circuit leads and bonds
  • WHS/OHS risk control measures and workplace procedures for carrying out work are followed
       
Element: On-track safe working requirements are identified and applied in accordance with workplace procedures and safety management system
       
Element: Specified leads and bonds are run and positioned appropriately to the formation conditions and to minimise potential damage from track maintenance machines
       
Element: Protection measures for traction return current are implemented prior to removing any cables, bonds or cutting rails
       
Element: Installation/maintenance of track circuit leads and bonds are appropriately sequenced in accordance with job schedule
       
Element: Positions of boxes and cable pits are checked to ensure compliance with specifications and appropriate follow-up action is initiated, as required
       
Element: Components and rail surfaces are prepared to ensure secure and sound connections in accordance with job specifications
       
Element: Leads or bonds are connected using specified fastening techniques ensuring technical compliance is achieved
       
Element: Established methods for dealing with unplanned situations are discussed with appropriate person/s and documented in accordance with workplace procedures
       
Element: Unplanned situations are dealt with safely in a manner that minimises risk to personnel and equipment and with the approval of an authorised person
       
Element: Track circuit leads and bonds are installed and connected efficiently without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices
       
Element: Bonds, leads and rail connections are inspected for damage or deterioration and appropriate corrective action is initiated in accordance with workplace procedures
       
Element: Appropriate tests are completed to identify components requiring repair or replacement in accordance with workplace procedures and job specifications
       
Element: Repair or replacement of components is carried out with due regard to train movements and safety of person/s involved
       
Element: Temporary bonding is installed, as required, and electrical readings on bonds/lead connections and insulated rail joints are taken to ensure compliance with specifications and site bonding layout plan
       
Element: Track-related equipment is inspected for faults or damage and all faults are documented and appropriate follow-up action is initiated in accordance with workplace procedures
       
Element: Complete installation/maintenance of track circuit leads and bonds
  • WHS/OHS risk control, work completion measures and workplace procedures are followed
       
Element: All cables and bonds associated with traction return current are reinstated and no additional bonds or current paths that may impact on track circuit correct operation are present
       
Element: Worksite is cleaned and made safe in accordance with workplace procedures
       
Element: On-track safe working requirements are removed in accordance with workplace procedures and safety management system
       
Element: Work completion is documented, relevant reports produced and appropriate person/s notified in accordance with workplace procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for work area are identified, obtained and applied 
 
 
 
 
 
 
 
 
 
 
WHS/OHS risk control measures and workplace procedures for carrying out work are followed 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
WHS/OHS risk control, work completion measures and workplace procedures are followed 
 
 
 
 

Forms

Assessment Cover Sheet

UEERS0024 - Install and maintain rail track circuit leads and bonds
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEERS0024 - Install and maintain rail track circuit leads and bonds

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: