Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UEPMNT202 Mapping and Delivery Guide
Carry out routine work activities in an ESI large scale wind generation environment

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEPMNT202 - Carry out routine work activities in an ESI large scale wind generation environment
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to undertake scheduled routine work activities in the Electricity Supply Industry (ESI) - large scale wind generation environment. Routine work activities can include undertaking tasks such as the operation of non-critical plant systems, lubricating plant, performing minor maintenance on electrical and mechanical equipment, cleaning plant, performing warehousing stock duties and operating mobile load shifting equipment. Competency in this unit requires the ability carry out routine work activities in an electrical supply generation environment - wind. Individuals will work, under supervision, as a maintenance operative in a power generation facility.No licensing, legislative or certification requirements apply to this unit at the time of publication. Note: Workplace practiceThe application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Maintenance
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to undertake routine work activities
  • Instructions for work activities are identified and confirmed, in accordance with workplace procedures
       
Element: Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) policies and procedures are identified and confirmed for use, in accordance with workplace procedures
       
Element: Tools, equipment and personnel protective equipment are identified and checked to ensure they are safe to use, in accordance with workplace procedures
       
Element: Resources and materials are identified and obtained, in accordance with workplace procedures
       
Element: Schedule of work, including practices for working safely such as use of Safety Data Sheets (SDS)/Material Safety Data Sheets (MSDS) and manual handling techniques, are confirmed, in accordance with workplace procedures
       
Element: Carry out work activities
  • Hazards are identified and risk controls are implemented, in accordance with workplace procedures
       
Element: Schedule of work is followed, in accordance with workplace procedures, to ensure work activities are completed to an agreed time frame, quality standard and minimum of waste
       
Element: Workplace procedures and practices, applicable to electricity supply by wind generation are applied
       
Element: Instructions are sought, if required, from appropriate personnel, in accordance with workplace procedures, in the event of unplanned events
       
Element: Regular checks of work quality are undertaken, in accordance with workplace procedures
       
Element: Check completed work activities
  • Appropriate personnel are notified of task completion, in accordance with workplace procedures
       
Element: Tools, equipment, surplus resources and materials are cleaned, checked and returned to storage, in accordance with workplace procedures
       
Element: Work area is cleaned up and made safe, in accordance with workplace procedures, using sustainable energy practices
       
Element: Records are updated, in accordance with workplace procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Instructions for work activities are identified and confirmed, in accordance with workplace procedures 
 
 
 
 
Hazards are identified and risk controls are implemented, in accordance with workplace procedures 
 
 
 
 
Appropriate personnel are notified of task completion, in accordance with workplace procedures 
 
 
 

Forms

Assessment Cover Sheet

UEPMNT202 - Carry out routine work activities in an ESI large scale wind generation environment
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEPMNT202 - Carry out routine work activities in an ESI large scale wind generation environment

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: