Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UEPMNT351 Mapping and Delivery Guide
Test and commission electrical equipment

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEPMNT351 - Test and commission electrical equipment
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to conduct testing and commissioning of electrical wiring systems and equipment. Commissioning and testing is the process of ensuring that all electrical wiring systems which includes cabling and associated devices such as switches, distribution boards, sockets and fittings and equipment in a power generation facility are meeting operational requirements. Competency in this unit requires the ability to plan work, test wiring systems, test electrical equipment, commission electrical equipment and to report on all completed work tasks. Individuals will, in general, work under supervision in an electrical, electronic and/or mechanical equipment repair workshop or on site. Power generation maintenance personnel are typically trained and authorised to receive permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit of competency may require a licence or training permit to practice in the workplace, where work is carried out on gas and electrical installations. Additional and/or other conditions may apply under state and territory legislative and regulatory licensing requirements.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Maintenance
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Complete work
  • Work is completed and appropriate personnel are notified, in accordance with workplace procedures
  • Work area is cleared of waste, cleaned, restored and secured in accordance with workplace procedures
  • Tools and equipment are cleaned, maintained and stored, in accordance with workplace procedures
  • Work completion details are finalised, in accordance with workplace procedures
       
Element: Plan and prepare for work
  • Requirements including scope of work and assigned roles are identified and confirmed with appropriate personnel or by site inspection, in accordance with workplace procedures
       
Element: Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations, legislative requirements, industry standards, codes of practice, manufacturers’ specifications, environmental obligations and workplace procedures are reviewed in preparation for work
       
Element: Resources are obtained and inspected for compliance with job specification
       
Element: Relevant plans, drawings and manuals are selected and used, in accordance with workplace procedures
       
Element: Correct materials and components for work are obtained and inspected, in accordance with workplace procedures, for compliance with job specification
       
Element: Work is planned, sequenced and prioritised, in accordance with workplace procedures
       
Element: Potential hazards are identified and risk control measures are selected and implemented, in accordance with workplace procedures
       
Element: Work area is prepared, in accordance with workplace procedures and requirements
       
Element: Test electricalwiring systems
  • Isolations for work are confirmed, in accordance with workplace procedures
       
Element: Electrical wiring systems are tested using appropriate plans, drawings and manuals, in accordance with workplace procedures
       
Element: Electrical wiring systems, including enclosures and/or supports, are inspected in accordance with workplace procedures, prior to testing to ensure absence of any damage, defects and deterioration
       
Element: Fixed electrical wiring is tested, as required, and results are documented to confirm compliance with job specification
       
Element: Test electricalequipment
  • Isolations are confirmed, where appropriate, in accordance with workplace procedures site requirements
       
Element: Electrical equipment is tested using appropriate plans, drawings and manuals, in accordance with workplace procedures
       
Element: Test conditions are confirmed, and equipment is inspected, in accordance with workplace procedures, to ensure absence of damage, defects and deterioration
       
Element: Electrical equipment is tested using appropriate testing techniques, in accordance with workplace procedures
       
Element: Electrical equipment test results are documented to confirm compliance with job specification
       
Element: Commission electricalequipment
  • Isolations are confirmed, where appropriate, in accordance with workplace procedures and site requirements
       
Element: Electrical equipment is commissioned using appropriate plans, drawings and manuals, in accordance with workplace procedures
       
Element: Equipment is set up, in accordance with workplace procedures, operational requirements or manufacturers' specifications
       
Element: Testing and monitoring procedures are followed, and results are documented to ensure electrical equipment functions within manufacturers' specifications
       
Element: Electrical equipment is commissioned, in accordance with workplace procedures
       
Element: Final inspection on electrical equipment is carried out, in accordance with workplace procedures
  • Work is completed and appropriate personnel are notified, in accordance with workplace procedures
       
Element: Work area is cleared of waste, cleaned, restored and secured in accordance with workplace procedures
       
Element: Tools and equipment are cleaned, maintained and stored, in accordance with workplace procedures
       
Element: Work completion details are finalised, in accordance with workplace procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work is completed and appropriate personnel are notified, in accordance with workplace procedures 
Work area is cleared of waste, cleaned, restored and secured in accordance with workplace procedures 
Tools and equipment are cleaned, maintained and stored, in accordance with workplace procedures 
Work completion details are finalised, in accordance with workplace procedures 
Requirements including scope of work and assigned roles are identified and confirmed with appropriate personnel or by site inspection, in accordance with workplace procedures 
 
 
 
 
 
 
 
Isolations for work are confirmed, in accordance with workplace procedures 
 
 
 
Isolations are confirmed, where appropriate, in accordance with workplace procedures site requirements 
 
 
 
 
Isolations are confirmed, where appropriate, in accordance with workplace procedures and site requirements 
 
 
 
 
Work is completed and appropriate personnel are notified, in accordance with workplace procedures 
 
 
 

Forms

Assessment Cover Sheet

UEPMNT351 - Test and commission electrical equipment
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEPMNT351 - Test and commission electrical equipment

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: