Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to undertake fault finding, diagnosis, repair or overhaul of complex mechanical valves, excluding associated servo or actuating units.A fault is defined as an abnormal condition or defect of a mechanical valve which may lead to a failure in power generation facility equipment, systems and/or plant. Diagnosis and repair requires the identification of the type of fault, its cause and the determination of repair actions. Competency in this unit requires the ability to plan work, remove mechanical valves for maintenance, perform mechanical valve maintenance, replace and/or install valves and to report on all completed work tasks. Individuals will, in general, work under supervision in an electrical, electronic and/or mechanical equipment repair workshop or on site. Power generation maintenance personnel are typically trained and authorised to receive permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit of competency may require a licence or training permit to practice in the workplace, where work is carried out on gas and electrical installations. Additional and/or other conditions may apply under state and territory legislative and regulatory licensing requirements. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Maintenance |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Complete work |
| |||||||
Element: Plan and prepare forwork |
| |||||||
Element: Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations, legislative requirements, industry standards, codes of practice, manufacturer specifications, environmental obligations and workplace procedures are reviewed in preparation for work | ||||||||
Element: Resources are obtained and inspected for compliance with job specification | ||||||||
Element: Relevant plans, drawings and manuals are selected and used, in accordance with workplace procedures | ||||||||
Element: Correct materials and components for work are obtained and inspected, in accordance with workplace procedures, for compliance with job specification | ||||||||
Element: Work is planned, sequenced and prioritised, in accordance with workplace procedures | ||||||||
Element: Potential hazards are identified and risk control measures are selected and implemented, in accordance with the workplace procedures | ||||||||
Element: Work area is prepared, in accordance with workplace procedures | ||||||||
Element: Remove complex mechanicalvalves for maintenance |
| |||||||
Element: Complex mechanical valve is disconnected, in accordance with workplace procedures | ||||||||
Element: Complex mechanical valve is removed, in accordance with workplace procedures | ||||||||
Element: Complex mechanical valve is inspected for abnormalities, in accordance with workplace procedures | ||||||||
Element: Perform complex mechanicalvalve maintenance |
| |||||||
Element: Complex mechanical valve is dismantled, clearly marked for identification and sketches are drawn, in accordance with workplace procedures | ||||||||
Element: Components are prepared for reassembly, in accordance with workplace procedures, manufacturers' drawings or manuals | ||||||||
Element: New components are inspected, in accordance with workplace procedures, to ensure compliance with manufacturers' specifications | ||||||||
Element: Dimensional inspection is performed, in accordance with workplace procedures, using precision measuring devices to ensure compliance with manufacturers' specifications | ||||||||
Element: Components are reassembled for testing, in accordance with workplace procedures and manufacturers' specifications | ||||||||
Element: Modifications or alterations are undertaken, in accordance with workplace procedures and manufacturers' specifications | ||||||||
Element: Components are levelled, aligned, coupled and connected, in accordance with workplace procedures and manufacturers' specifications | ||||||||
Element: Complex mechanical valves are pressure tested, monitored and adjusted, in accordance with workplace procedures and manufacturers' specifications | ||||||||
Element: Replaceorinstall complex mechanicalvalves |
| |||||||
Element: Complex mechanical valve is replaced, in accordance with workplace procedures and manufacturers' specifications | ||||||||
Element: Complex mechanical valve is connected, in accordance with workplace procedures and manufacturers' specifications | ||||||||
Element: Final inspection is completed, in accordance with workplace procedures |
| |||||||
Element: Work area is cleared of waste, cleaned, restored and secured, in accordance with workplace procedures | ||||||||
Element: Tools and equipment are cleaned, maintained and stored, in accordance with workplace procedures | ||||||||