Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEPMNT408 Mapping and Delivery Guide
Install hydro turbines
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEPMNT408 - Install hydro turbines |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to install hydro turbines. The installation of a hydro turbine refers to a hydro turbine being removed from service, for repair and overhaul.Installation is a key feature of placing hydro turbines into service, it can include conducting repairs and/or the overhaul of a hydro turbine to ensure reliability of operation during its service life.Competency in this unit requires the ability to plan work, disassemble a hydro turbine, inspect hydro turbine's components, repair a hydro turbine and/or its' components and to report on all completed work tasks. Individuals will, in general, work under supervision as a maintenance operative in a power generation facility. Power generation maintenance personnel are typically trained and authorised to receive permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit of competency may require a licence or training permit to practice in the workplace, where work is carried out on gas and electrical installations. Additional and/or other conditions may apply under state and territory legislative and regulatory licensing requirements. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Maintenance |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Complete work |
| |||||||
Element: Plan and prepare for work |
| |||||||
Element: Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations, legislative requirements, industry standards, codes of practice, manufacturers’ specifications, environmental obligations and workplace procedures are reviewed in preparation for work | ||||||||
Element: Resources are obtained and inspected for compliance with job specification | ||||||||
Element: Relevant plans, drawings and manuals are selected and used, in accordance with workplace procedures | ||||||||
Element: Correct materials and components for work are obtained and inspected for compliance with job specification | ||||||||
Element: Work is planned, sequenced and prioritised, in accordance with workplace procedures | ||||||||
Element: Potential hazards are identified and risk control measures are selected and implemented, in accordance with workplace procedures | ||||||||
Element: Work area is prepared, in accordance with workplace procedures | ||||||||
Element: Disassemble hydroturbine |
| |||||||
Element: Hydro turbine is disassembled, in accordance with manufacturers' specifications and workplace procedures | ||||||||
Element: Hydro turbine components are removed in priority order, in accordance with manufacturers' specification and workplace procedures | ||||||||
Element: Disassembly is carried out to facilitate reassembly, in accordance with workplace procedures | ||||||||
Element: Components are measured and clearances are taken, in accordance with workplace procedures, to determine conformity to manufacturer’s limits and to ensure assembly meets manufacturers' specifications | ||||||||
Element: Measurements and clearances are recorded, in accordance with manufacturer' specifications and workplace procedures | ||||||||
Element: Inspect hydroturbine components |
| |||||||
Element: Faults are identified and recorded, in accordance with workplace procedures | ||||||||
Element: New components are inspected for compliance to manufacturers' specifications, in accordance with workplace procedures | ||||||||
Element: Components are prepared for assembly, in accordance with workplace procedures | ||||||||
Element: Repair hydroturbineor components |
| |||||||
Element: Repairs are tested and results are analysed to ensure conformance to manufactures' specifications, in accordance with workplace procedures | ||||||||
Element: Data from testing is recorded, in accordance with workplace procedures | ||||||||
Element: Reassemble hydroturbine |
| |||||||
Element: Isolations are confirmed, in accordance with workplace procedures | ||||||||
Element: Components are refitted, in accordance with workplace procedures and manufacturers' specifications. | ||||||||
Element: Hydro turbine is assembled, in accordance with workplace procedures and manufacturers' specifications. | ||||||||
Element: Hydro turbine is test run, and operating characteristics are monitored, to ensure compliance with manufacturers' specifications, in accordance with workplace procedures |
| |||||||
Element: Work area is cleared of waste, cleaned, restored and secured, in accordance with workplace procedures | ||||||||
Element: Tools and equipment are maintained and stored, in accordance with workplace procedures | ||||||||
Element: Work completion details are finalised, in accordance with workplace procedures |