Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UEPMNT424 Mapping and Delivery Guide
Monitor efficiency of thermal steam cycle power plant

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEPMNT424 - Monitor efficiency of thermal steam cycle power plant
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required for the collection of data and the calculation of the efficiency of power generation plant associated with the thermal steam cycle.Data collection is the process of gathering and measuring information systematically so that outcomes can be evaluated and calculations undertaken to ensure the efficiency of all plant associated with the thermal steam cycle in a power generation facility.Competency in this unit requires the ability to plan for plant in-service checks, carry out in-service electrical checks, carry out corrective actions and complete work. Individuals will, in general, work as a maintenance operative in a power generation facility. Power generation maintenance personnel are typically trained and authorised to receive permits to workNo licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit of competency may require a licence or training permit to practice in the workplace, where work is carried out on gas and electrical installations. Additional and/or other conditions may apply under state and territory legislative and regulatory licensing requirements.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Maintenance
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Collect data
  • Information is collected, in accordance with workplace procedures, legislative requirements, industry standards and Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations
  • Thermal steam cycle plant is identified and its' status is established
  • Tools and equipment are identified and acquired, in accordance with workplace procedures
  • Specialist assistance or equipment is sought, if required
  • Information is recorded, in accordance with workplace procedures
       
Element: Perform calculations
  • Calculations are performed, in accordance with workplace procedures
  • Information on input and output is checked for accuracy
  • Thermal steam cycle plant performance is measured and calculated, in accordance with workplace procedures
       
Element: Thermal steam cycle plant is identified and its' status is established
       
Element: Tools and equipment are identified and acquired, in accordance with workplace procedures
       
Element: Specialist assistance or equipment is sought, if required
       
Element: Information is recorded, in accordance with workplace procedures
  • Calculations are performed, in accordance with workplace procedures
       
Element: Information on input and output is checked for accuracy
       
Element: Thermal steam cycle plant performance is measured and calculated, in accordance with workplace procedures
       
Element: Evaluate and analyse information
  • Analysis of technical and operational performance information is conducted to identify if abnormal operating conditions
       
Element: Causes of any abnormal performance in thermal steam cycle plant is identified
       
Element: Thermal steam cycle plant integrity is maintained through consultation with designated personnel and operational documentation
       
Element: Produce report and complete work
  • Information and data are collated and documented, in accordance with workplace procedures
       
Element: Reports are produced, in accordance with workplace procedures
       
Element: Recommendations are made to appropriate personnel, in accordance with workplace procedures
       
Element: Implementation of recommendations are monitored, in accordance with workplace procedures, to ensure thermal steam cycle plant efficiency
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Information is collected, in accordance with workplace procedures, legislative requirements, industry standards and Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations 
Thermal steam cycle plant is identified and its' status is established 
Tools and equipment are identified and acquired, in accordance with workplace procedures 
Specialist assistance or equipment is sought, if required 
Information is recorded, in accordance with workplace procedures 
Calculations are performed, in accordance with workplace procedures 
Information on input and output is checked for accuracy 
Thermal steam cycle plant performance is measured and calculated, in accordance with workplace procedures 
 
 
 
Calculations are performed, in accordance with workplace procedures 
 
 
Analysis of technical and operational performance information is conducted to identify if abnormal operating conditions 
 
 
Information and data are collated and documented, in accordance with workplace procedures 
 
 
 

Forms

Assessment Cover Sheet

UEPMNT424 - Monitor efficiency of thermal steam cycle power plant
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEPMNT424 - Monitor efficiency of thermal steam cycle power plant

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: