Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEPMNT435 Mapping and Delivery Guide
Diagnose and repair faults in wind turbine mechanical systems
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEPMNT435 - Diagnose and repair faults in wind turbine mechanical systems |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to undertake the diagnosis and repair of wind turbine mechanical systems. Diagnosis and repair of wind turbine mechanical system faults requires the inspection, repair and verification that the system is operating efficiently and is meeting operational requirements.Competency in this unit requires the ability to plan work, verify fault, find fault, determine cause of fault, repair fault and complete all work tasks. Individuals will, in general, work under supervision in an electrical, electronic and/or mechanical equipment repair workshop or on site. Power generation maintenance personnel are typically trained and authorised to receive permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit of competency may require a licence or training permit to practice in the workplace, where work is carried out on gas and electrical installations. Additional and/or other conditions may apply under state and territory legislative and regulatory licensing requirements. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Maintenance |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan and prepare work |
| |||||||
Element: Verify fault |
| |||||||
Element: Repair fault |
| |||||||
Element: Complete work |
| |||||||
Element: Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations, legislative requirements, industry standards, codes of practice, manufacturers’ specifications, environmental obligations and workplace procedures are reviewed in preparation for work | ||||||||
Element: Resources are obtained and inspected for compliance with job specification | ||||||||
Element: Relevant plans, drawings and manuals are selected and used, in accordance with workplace procedures | ||||||||
Element: Correct materials and components for work are obtained and inspected for compliance with job specifications | ||||||||
Element: Work is planned, sequenced and prioritised, in accordance with workplace procedures | ||||||||
Element: Potential hazards are identified and risk control measures are implemented, in accordance with workplace procedures | ||||||||
Element: Work area is prepared, in accordance with workplace procedures |
| |||||||
Element: Fault indicators, technical information and diagnostic techniques are used to verify reported wind turbine mechanical system faults, in accordance with workplace procedures | ||||||||
Element: Wind turbine mechanical system faults are reproduced and monitored, if practical, in accordance with workplace procedures |
| |||||||
Element: Wind turbine mechanical system equipment components, pipes, couplings, gears and support fixings are inspected for obvious faults, in accordance with workplace procedures | ||||||||
Element: Fault finding and diagnostic techniques are selected and used to determine fault cause, in accordance with workplace procedures | ||||||||
Element: Wind turbine mechanical system faulty equipment or components are localised and/or isolated, and the malfunction is confirmed by inspection and testing, in accordance with site requirements and workplace procedures | ||||||||
Element: Test and measurement instruments are used, in accordance with manufacturers’ instructions | ||||||||
Element: Determine cause of fault |
| |||||||
Element: Wind turbine mechanical system monitoring equipment, fault indicators and maintenance records are reviewed to obtain details relating to fault | ||||||||
Element: Analysis on cause of wind turbine mechanical system fault is completed, in accordance with the workplace procedures |
| |||||||
Element: Wind turbine mechanical system's faulty, worn, damaged or unsecured equipment or components are repaired, in accordance with workplace procedures | ||||||||
Element: All faults are repaired, in accordance with the workplace procedures | ||||||||
Element: Correct operation of wind turbine mechanical system is confirmed, in accordance with site requirements and workplace procedures | ||||||||
Element: Final inspection is performed, in accordance with workplace procedures |
| |||||||
Element: Work area is cleared of waste, cleaned, restored and secured in accordance with workplace procedures | ||||||||
Element: Tools and equipment are maintained and stored, in accordance with workplace procedures | ||||||||
Element: Work completion details are finalised, in accordance with workplace procedures |