Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to conduct testing and commissioning of a wind turbine generator. Testing and commissioning of wind turbine generators includes the assessment and verification that all equipment and components are operating efficiently and are meeting operational requirements.Competency in this unit requires the ability to plan work, test systems equipment, test system and complete all work tasks. Individuals will, in general, work under supervision in an electrical, electronic and/or mechanical equipment repair workshop or on site. Power generation maintenance personnel are typically trained and authorised to receive permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit of competency may require a licence or training permit to practice in the workplace, where work is carried out on gas and electrical installations. Additional and/or other conditions may apply under state and territory legislative and regulatory licensing requirements. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Maintenance |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Test system |
| |||||||
Element: Complete work |
| |||||||
Element: Plan and prepare for work |
| |||||||
Element: Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations, legislative requirements, industry standards, codes of practice, manufacturers’ specifications, environmental obligations and workplace procedures are reviewed in preparation for work | ||||||||
Element: Resources are obtained and inspected for compliance with job specification | ||||||||
Element: Relevant plans, drawings and manuals are selected and used, in accordance with workplace procedures | ||||||||
Element: Correct materials and components for work are obtained and inspected for compliance with job specification | ||||||||
Element: Commissioning is planned, sequenced and prioritised, in accordance with workplace procedures | ||||||||
Element: Potential hazards are identified and risk control measures are implemented, in accordance with workplace procedures | ||||||||
Element: Work area is accessed and prepared, in accordance with workplace procedures | ||||||||
Element: Test systems equipment |
| |||||||
Element: Wind turbine generator system equipment is visually inspected to ensure absence of any damage, defects and deterioration, in accordance with workplace procedures and commissioning plan | ||||||||
Element: Wind turbine generator system equipment is tested, in conjunction with other related systems and equipment, to ensure correct operation, in accordance with workplace procedures and commissioning plan | ||||||||
Element: Wind turbine generator wiring systems are checked and tested, in conjunction with other related systems and equipment, in accordance with workplace procedures and commissioning plan |
| |||||||
Element: Wind turbine generator system, plant and equipment are set up and calibrated, in accordance with workplace procedures, operational requirements and manufacturers' specifications | ||||||||
Element: Wind turbine generator system is commissioned using appropriate plans, drawings and manuals, in accordance with workplace procedures and commissioning plan | ||||||||
Element: Wind turbine generator system is commissioned, in conjunction with other related systems and equipment, in accordance with workplace procedures and commissioning plan | ||||||||
Element: Wind turbine generator equipment is commissioned, in accordance with workplace procedures and commissioning plan | ||||||||
Element: Faulty wind turbine generator equipment is repaired or reported, in accordance with workplace procedures | ||||||||
Element: Final inspection is carried out, in accordance with workplace procedures and commissioning plan |
| |||||||
Element: Work area is cleared of waste, cleaned, restored and secured, in accordance with workplace procedures | ||||||||
Element: Tools and equipment are maintained and stored, in accordance with workplace procedures | ||||||||
Element: Work completion details are finalised, in accordance with workplace procedures |