Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UEPOPS238 Mapping and Delivery Guide
Maintain battery banks and cells

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEPOPS238 - Maintain battery banks and cells
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to undertake the maintenance of all battery cells or banks. Batteries store energy so that it can be used when needed, batteries can be charged, discharged and recharged several times. The types of equipment supported by batteries in a power generation facility can include emergency lighting systems and alarm and protection systems. Competency in this unit requires the ability to plan and prepare for battery cell/bank maintenance work, conduct tests on battery cell/bank, analyse results of tests to determine its capability, perform routine maintenance, report abnormalities and documenting work when completed. Individuals will, in general, work as an operator, in a power generation facility.Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Operations
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Complete work
  • Battery cell and/or bank work is completed and relevant personnel are notified, in accordance with workplace procedures
  • Work area is cleared of waste, cleaned, restored and secured, in accordance with workplace procedures
  • Battery cell and/or bank tools and equipment are maintained and stored, in accordance with workplace procedures
       
Element: Planand prepare for work
  • Requirements are identified from work order and is confirmed with appropriate personnel and/or by site inspection, in accordance with workplace procedures
       
Element: Work, Health and Safety (WHS)/Occupational Health and Safety (OHS)regulations, legislative requirements, industry standards, codes of practice, manufacturers’ specifications, environmental obligations and workplace procedures are identified, applied and monitored
       
Element: Resources are obtained and inspected for compliance with job specification, in accordance with workplace procedures
       
Element: Relevant plans, drawings and manuals are selected and used, in accordance with workplace procedures
       
Element: Correct size, type and quantity of materials and/or components are obtained and inspected, in accordance with workplace procedures
       
Element: Work is sequenced and prioritised, in accordance with workplace procedures and site requirements
       
Element: Potential hazards and risk control measures are selected and implemented, in accordance with workplace procedures and Material Safety Data Sheets (MSDS) processes
       
Element: Work area is prepared, in accordance with workplace procedures
       
Element: Conduct tests on battery cell/bank
  • Battery cell and/or bank is inspected prior to testing to ensure absence of any damage or defects, in accordance with workplace procedures
       
Element: Tests are carried out to determine battery cell or bank condition, in accordance with workplace procedures
       
Element: Test results are recorded and analysed to determine battery cell and/or bank capabilities, in accordance with workplace procedures
       
Element: Testing and measurement instruments are used, in accordance with manufacturers' specifications and workplace procedures
       
Element: Faults found are documented and reported to appropriate personnel, in accordance with workplace procedures
       
Element: Conduct maintenance on battery cell/bank
  • Isolations are confirmed, where appropriate, in accordance with workplace procedures
       
Element: Battery cell and/or bank is maintained using plans, drawings and manuals in accordance with workplace procedures
       
Element: Cleaning or adjustments are carried out on battery cell and/or bank, in accordance with workplace procedures
       
Element: Maintenance and adjustments are carried out, in accordance with workplace procedures
       
Element: Final inspection is carried out, in accordance with workplace procedures.
  • Battery cell and/or bank work is completed and relevant personnel are notified, in accordance with workplace procedures
       
Element: Work area is cleared of waste, cleaned, restored and secured, in accordance with workplace procedures
       
Element: Battery cell and/or bank tools and equipment are maintained and stored, in accordance with workplace procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Battery cell and/or bank work is completed and relevant personnel are notified, in accordance with workplace procedures 
Work area is cleared of waste, cleaned, restored and secured, in accordance with workplace procedures 
Battery cell and/or bank tools and equipment are maintained and stored, in accordance with workplace procedures 
Requirements are identified from work order and is confirmed with appropriate personnel and/or by site inspection, in accordance with workplace procedures 
 
 
 
 
 
 
 
Battery cell and/or bank is inspected prior to testing to ensure absence of any damage or defects, in accordance with workplace procedures 
 
 
 
 
Isolations are confirmed, where appropriate, in accordance with workplace procedures 
 
 
 
Battery cell and/or bank work is completed and relevant personnel are notified, in accordance with workplace procedures 
 
 

Forms

Assessment Cover Sheet

UEPOPS238 - Maintain battery banks and cells
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEPOPS238 - Maintain battery banks and cells

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: