UEPOPS243 Mapping and Delivery Guide
Operate air conditioning plant
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEPOPS243 - Operate air conditioning plant |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to operate and inspect all air conditioning plant.Air conditioning in power generation facilities refers to systems that cool air and remove humidity from areas filled with heat producing plant and equipment. A complete system of heating, ventilation, and air conditioning is referred to as Heating, Ventilation and Air Conditioning (HVAC).Competency in this unit requires the ability to plan and prepare work; operate, test, analyse and report on air conditioning plant and complete all documentation. Individuals will, in general, work under supervision, in a power generation facility as an operator.Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Operations |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan and prepare work |
| |||||||
Element: Testplant operation |
| |||||||
Element: Analyse plant faults |
| |||||||
Element: Work requirements are identified from relevant personnel and documentation, in accordance with workplace procedures | ||||||||
Element: Documentation to determine air conditioning plant status is assessed and evaluated, in accordance with workplace procedures | ||||||||
Element: Inspection for service is carried out, in accordance with workplace procedures and site operational requirements | ||||||||
Element: Air conditioning plant operational prerequisites are established, in accordance with manufacturers' recommendations and workplace procedures | ||||||||
Element: Sequence for recommissioning of air conditioning plant is determined, in accordance with workplace procedures | ||||||||
Element: Conductoperation of air conditioning plant |
| |||||||
Element: Air conditioning plant is monitored and observed, in accordance with workplace procedures, to detect deviations from normal operating conditions | ||||||||
Element: Corrective actions are taken to rectify air conditioning plant abnormalities, in accordance with workplace procedures | ||||||||
Element: Air conditioning plant to be removed from service is identified and removed, in accordance with workplace procedures | ||||||||
Element: Corrective actions are taken, in accordance with workplace procedures, safety rules and site requirements, when abnormalities are identified during removal of air conditioning plant from service |
| |||||||
Element: Air conditioning plant is observed, in accordance with workplace procedures, for correct operational response | ||||||||
Element: Corrective action is taken, in accordance with workplace procedures | ||||||||
Element: Air conditioning plant is returned to required operational status upon completion of testing, in accordance with workplace procedures |
| |||||||
Element: Air conditioning plant integrity and personnel safety is maintained, in accordance with workplace procedures, through consultation with appropriate personnel and technical and operational documentation | ||||||||
Element: Monitor and inspect plant |
| |||||||
Element: Air conditioning plant is monitored or inspected, in accordance with workplace procedures, for normal operation or to detect deviations | ||||||||
Element: Appropriate personnel are notified, in accordance with workplace procedures, when defects are detected | ||||||||
Element: Complete documentation |
| |||||||
Element: Documentation is updated, in accordance with workplace procedures |