UEPOPS309 Mapping and Delivery Guide
Operate and monitor air conditioning plant and ventilation systems
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEPOPS309 - Operate and monitor air conditioning plant and ventilation systems |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to operate and monitor air conditioning plant, ventilation systems and associated equipment.Air conditioning is used to cool and/or dehumidify a variety of plant that is heat producing in power generation facilities. Ventilationis the process of changing or replacing air to control temperatures or remove a combination of moisture, odour, smoke, heat, dust, airborne bacteria, carbon dioxide or to replenish oxygen. Competency in this unit requires the ability to plan work, operate and monitor air conditioning plant and ventilation systems, test air conditioning plant and ventilation system operations, identify air conditioning plant and ventilation system faults, monitor and inspect air conditioning plant and ventilation system and the completion of all documentation. Individuals will, in general, work under supervision, in a power generation facility as an operator. Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Operations |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan and prepare for work |
| |||||||
Element: Work, air conditioning plant and ventilation system and resource requirements are identified, in accordance with workplace procedures, and from relevant personnel and documentation | ||||||||
Element: Quality assurance requirements are identified, in accordance with workplace procedures | ||||||||
Element: Documentation to determine air conditioning plant and ventilation system status is assessed and evaluated, in accordance with workplace procedures | ||||||||
Element: Inspection and field preparation for air conditioning plant and ventilation system service is carried out, in accordance with workplace and manufacturers' procedures | ||||||||
Element: Air conditioning plant and ventilation system operational prerequisites are established, in accordance with workplace procedures and manufacturers' recommendations | ||||||||
Element: Sequence and air conditioning plant and ventilation system requirements for operation is determined, in accordance with workplace procedures and site requirements | ||||||||
Element: Reporting requirements are carried out, in accordance with workplace procedures | ||||||||
Element: Performoperation and monitoring of air conditioning equipment and ventilation systems |
| |||||||
Element: Air conditioning plant and ventilation system is monitored and observed, in accordance with workplace procedures, to detect deviations from normal operating conditions | ||||||||
Element: Air conditioning plant and ventilation system performance and quality is monitored, in accordance with workplace procedures, including temperature and airflow humidity | ||||||||
Element: Corrective actions are taken to rectify abnormalities, in accordance with workplace procedures, industry standards and site requirements | ||||||||
Element: Test air conditioning and ventilation systemplant operation |
| |||||||
Element: Corrective action is taken, in accordance with workplace procedures, when response does not meet with documentation, air conditioning and ventilation system plant integrity or personnel safety requirements | ||||||||
Element: Air conditioning plant and ventilation system is returned to required operational status upon completion of testing, in accordance with workplace procedures | ||||||||
Element: Identify air conditioning and ventilation systemplant faults |
| |||||||
Element: Corrective action is taken, in accordance with workplace procedures | ||||||||
Element: Air conditioning plant and ventilation system integrity and personnel safety is maintained, in accordance with workplace procedures, and in consultation with appropriate personnel and technical and operational documentation | ||||||||
Element: Monitor and inspect air conditioning and ventilation system plant |
| |||||||
Element: Air conditioning plant and ventilation system is monitored and inspected, in accordance with workplace procedures, for normal operation or to detect deviations | ||||||||
Element: Appropriate personnel are notified when defects are detected, in accordance with workplace procedures | ||||||||
Element: Complete documentation |
| |||||||
Element: Documentation is updated, in accordance with workplace procedures |