Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEPOPS310 Mapping and Delivery Guide
Operate bulk coal handling plant
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEPOPS310 - Operate bulk coal handling plant |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to address the storage, reclaiming and despatching of bulk coal. It also encompasses monitoring any associated mobile bulk coal handling plant operations.Bulk coal handling plant is used to convey coal from rail transport wagons to boilers or storage bunkers. They are also used to process raw coal, to crush and stack coal to feed directly into power generation facilities. Competency in this unit requires the ability to plan and prepare work, operate bulk coal handling plant, inspect, test, analyse and report bulk coal handling plant faults and complete documentation. Individuals will, in general, work under supervision, in a power generation facility as an operator.Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Operations |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan and prepare work |
| |||||||
Element: Work, bulk coal handling plant and resource requirements are identified from appropriate personnel and documentation, in accordance with workplace procedures | ||||||||
Element: Quality assurance requirements recognised and adhered to, in accordance with workplace procedures and industry standards | ||||||||
Element: Basic mineralogy information is applied, in accordance with workplace procedures and site requirements | ||||||||
Element: Work schedule is consistent with job requirements, in accordance with workplace procedures | ||||||||
Element: Pad is prepared for coal stockpiling, including removal of contaminants and drainage, in accordance with workplace procedures | ||||||||
Element: Preoperational checks are carried out on bulk coal handling plant, in accordance with manufacturers' recommendations and workplace procedures | ||||||||
Element: Sequence for recommissioning of bulk coal handling plant is determined, in accordance with workplace procedures | ||||||||
Element: Conduct operation of bulk coal handlingplant |
| |||||||
Element: Bulk coal handling plant is operated, in accordance with workplace procedures and manufacturers' recommendations | ||||||||
Element: Bulk coal handling plant is monitored, in accordance with workplace procedures, to detect deviations from normal operating conditions | ||||||||
Element: Corrective actions are taken to rectify bulk coal handling plant abnormalities, in accordance with industry standards and workplace procedures | ||||||||
Element: Bulk coal handling plant to be removed from service is identified and isolated, in accordance with workplace procedures | ||||||||
Element: Inspection and fault finding are carried out, in accordance with manufacturers' recommendations and workplace procedures | ||||||||
Element: Coal is placed or bunkered down in predetermined stockpile location, in accordance with workplace procedures | ||||||||
Element: Reclaim specifications are received, despatch area is notified and equipment is made ready, in accordance with workplace procedures | ||||||||
Element: Specified coal is blended, loaded, sampled and despatched, in accordance with workplace procedures | ||||||||
Element: Test bulk coal handlingplant operation |
| |||||||
Element: Bulk coal handling plant is observed for correct operational response, in accordance with workplace procedures | ||||||||
Element: Corrective action is taken when response does not meet with documentation, workplace procedures, bulk coal handling plant integrity or personnel safety requirements | ||||||||
Element: Bulk coal handling plant is returned to required operational status upon completion of testing, in accordance with workplace procedures | ||||||||
Element: Analyse bulk coal handling plantfaults |
| |||||||
Element: Corrective action is taken, in accordance with workplace procedures | ||||||||
Element: Supplementary personnel are arranged for investigation of identified operational abnormalities, if required, in accordance with workplace procedures | ||||||||
Element: Inspect bulk coal handlingplant |
| |||||||
Element: Bulk coal handling plant is inspected, in accordance with workplace procedures, to detect deviations from normal operating conditions | ||||||||
Element: Appropriate personnel are notified, in accordance with workplace procedures, when defects are detected | ||||||||
Element: Complete documentation |
| |||||||
Element: Documentation is updated, in accordance with workplace procedures |