Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEPOPS313 Mapping and Delivery Guide
Operate and monitor boiler draught system
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEPOPS313 - Operate and monitor boiler draught system |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to operate, inspect and monitor boiler draught equipment.Boiler draught is defined as the difference between atmospheric pressure and the pressure existing in a furnace or the flue gas passage of aboiler.Boiler draught is important to the smooth operation of all the systems in a power generating facility.Competency in this unit requires the ability to plan work, operate boiler draught system plant, test boiler draught system plant, analyse boiler draught system plant faults, monitor and inspect boiler draught system plant and complete all documentation. Individuals will, in general, work under supervision, in a power generation facility as an operator. Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Operations |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan and prepare for boiler draught system operation |
| |||||||
Element: Work requirements including work to permit are identified, in accordance with workplace procedures, from appropriate personnel and documentation | ||||||||
Element: Documentation to determine boiler draught system plant status is assessed and evaluated, in accordance with workplace procedures | ||||||||
Element: Inspection, preoperational checks and field preparations for boiler draught system plant service are carried out, in accordance with workplace procedures and manufacturers' recommendations | ||||||||
Element: Boiler draught system plant operational prerequisites are established, in accordance with workplace procedures and manufacturers' recommendations | ||||||||
Element: Sequence for recommissioning of boiler draught system plant is determined to suit existing circumstances in accordance with workplace procedures and site requirements | ||||||||
Element: Operate boiler draught systemplant |
| |||||||
Element: Boiler draught system plant is monitored and observed, in accordance with workplace procedures, to detect deviations from normal operating conditions | ||||||||
Element: Corrective actions are taken to rectify abnormalities, in accordance with workplace procedures, industry standards and site requirements | ||||||||
Element: Test plant boiler draught systemoperation |
| |||||||
Element: Boiler draught system plant is observed for correct operational response, in accordance with workplace procedures | ||||||||
Element: Corrective action is taken, in accordance with workplace procedures, when response does not meet with documentation, boiler draught system plant integrity or personnel safety requirements | ||||||||
Element: Boiler draught system plant is returned to required operational status upon completion of testing, in accordance with workplace procedures | ||||||||
Element: Analyse boiler draught system plant faults |
| |||||||
Element: Corrective action is taken, in accordance with workplace procedures | ||||||||
Element: Boiler draught system plant integrity and personnel safety is maintained, in accordance with workplace procedures, and in consultation with appropriate personnel and technical and operational documentation | ||||||||
Element: Monitor and inspect boiler draught systemplant |
| |||||||
Element: Boiler draught system plant is monitored and/or inspected, in accordance with workplace procedures, for normal operation or to detect deviations | ||||||||
Element: Appropriate personnel are notified, in accordance with workplace procedures, when defects are detected | ||||||||
Element: Complete documentation |
| |||||||
Element: Documentation is updated, in accordance with workplace procedures |