Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UEPOPS316 Mapping and Delivery Guide
Operate and monitor boiler steam/water cycle

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEPOPS316 - Operate and monitor boiler steam/water cycle
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to operate, inspect and monitor a boiler steam and/or water cycle.The relationship of components within the boiler and steam and/or water cycle in a power generating unit system, and the effect of adjustments made to components, can impact the efficiency and safety of a power generating facility's operation.Competency in this unit requires the ability to plan work, operate boiler steam and/or water cycle plant, test boiler steam and/or water cycle plant, analyse boiler steam and/or water cycle plant faults, monitor and inspect boiler steam and/or water cycle plant and the completion of all documentation. Individuals will, in general, work under supervision, in a power generation facility as an operator. Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practicesThe application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Operations
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan and preparefor boiler steam water cycle operation
  • Safety issues related to operating and monitoring boiler steam and water cycle plant are identified, in accordance with workplace procedures and Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations and legislative requirements
       
Element: Work requirements, including permits to work, are identified, in accordance with workplace procedures, from appropriate personnel and documentation
       
Element: Documentation to determine boiler steam and water cycle plant status is assessed and evaluated, in accordance with workplace procedures
       
Element: Inspection, preoperational checks and field preparations for boiler steam and water cycle service are carried out, in accordance with workplace procedures and manufacturers' recommendations
       
Element: Boiler steam and water cycle plant operational prerequisites are established, in accordance with workplace procedures and manufacturers' recommendations
       
Element: Sequence for recommissioning of boiler steam and water cycle plant is determined, in accordance with workplace procedures and site requirements
       
Element: Operateboiler steam/water cycle plant
  • Boiler steam and water cycle plant is operated, in accordance with workplace procedures and manufacturers' operating recommendations
       
Element: Boiler steam and water cycle plant is monitored and observed, in accordance with workplace procedures, to detect deviations from normal operating conditions
       
Element: Corrective actions are taken to rectify abnormalities, in accordance with workplace procedures and industry standards
       
Element: Boiler steam and water cycle plant is identified and removed from service, in accordance with workplace procedures
       
Element: Corrective actions are taken, in accordance with workplace procedures when boiler steam and water cycle plant abnormalities are identified during removal from service
       
Element: Test boiler steam/water cycleplant operation
  • Operational tests are performed, in accordance with workplace procedures
       
Element: Boiler steam and water cycle plant is observed for correct operational response, in accordance with workplace procedures
       
Element: Corrective action is taken, in accordance with workplace procedures, when response does not meet with documentation, boiler steam and water cycle plant integrity or personnel safety requirements
       
Element: Boiler steam and water cycle plant is returned to required operational status upon completion of testing, in accordance with workplace procedures
       
Element: Analyse boiler steam/water cycleplant faults
  • Causes of abnormal boiler steam and water cycle plant operating conditions are identified, in accordance with workplace procedures, and by analysing technical and operational information
       
Element: Corrective action is taken, in accordance with workplace procedures
       
Element: Boiler steam and water cycle plant integrity and personnel safety are maintained, in accordance with workplace procedures, and in consultation with appropriate personnel and technical and operational documentation
       
Element: Monitor and inspect boiler steam/water cycleplant
  • Boiler steam and water cycle plant to be monitored and inspected is physically identified, in accordance with workplace procedures
       
Element: Boiler steam and water cycle plant is monitored and inspected, in accordance with workplace procedures for normal operation or to detect deviations
       
Element: Appropriate personnel are notified, in accordance with workplace procedures, when defects are detected
       
Element: Complete documentation
  • Boiler steam and water cycle plant problems, movements, abnormalities and status are reported, in accordance with workplace procedures
       
Element: Documentation is updated, in accordance with workplace procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Safety issues related to operating and monitoring boiler steam and water cycle plant are identified, in accordance with workplace procedures and Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations and legislative requirements 
 
 
 
 
 
Boiler steam and water cycle plant is operated, in accordance with workplace procedures and manufacturers' operating recommendations 
 
 
 
 
Operational tests are performed, in accordance with workplace procedures 
 
 
 
Causes of abnormal boiler steam and water cycle plant operating conditions are identified, in accordance with workplace procedures, and by analysing technical and operational information 
 
 
Boiler steam and water cycle plant to be monitored and inspected is physically identified, in accordance with workplace procedures 
 
 
Boiler steam and water cycle plant problems, movements, abnormalities and status are reported, in accordance with workplace procedures 
 

Forms

Assessment Cover Sheet

UEPOPS316 - Operate and monitor boiler steam/water cycle
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEPOPS316 - Operate and monitor boiler steam/water cycle

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: