Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEPOPS331 Mapping and Delivery Guide
Operate and monitor water systems (condensate and feedwater)
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEPOPS331 - Operate and monitor water systems (condensate and feedwater) |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to operate, inspect and monitor water systems (condensate and feedwater). Water systems are used to supply high quality water to the generator and to heat water. Between the condenser and feedwater pump, the water is called condensate and between the feedwater pump and the generator the water is called feedwater.Competency in this unit requires the ability to plan work, operate water system (condensate and feedwater) plant, test water system plant, analyse water system plant faults, monitor and inspect water system plant and the completion of all documentation. Individuals will, in general, work as an operator in a power generation plant. Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Operations |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan and preparefor water systems plant operation |
| |||||||
Element: Work requirements including permit to work are identified, in accordance with workplace procedures, from relevant personnel and documentation | ||||||||
Element: Documentation to determine water system plant status is assessed and evaluated, in accordance with workplace procedures | ||||||||
Element: Inspection, preoperational checks and field preparation for water system plant service are carried out, in accordance with workplace procedures and manufacturers' recommendations | ||||||||
Element: Water system plant operational prerequisites are established, in accordance with workplace procedures and manufacturers' recommendations | ||||||||
Element: Sequence for recommissioning of water system plant is determined, in accordance with workplace procedures and site requirements | ||||||||
Element: Operate water systemplant |
| |||||||
Element: Water system plant is monitored and observed, in accordance with workplace procedures, to detect deviations from normal operating conditions | ||||||||
Element: Corrective actions are taken to rectify water system abnormalities, in accordance with workplace procedures, industry standards and site requirements | ||||||||
Element: Test water systemplant operation |
| |||||||
Element: Water system plant is observed for correct operational response, in accordance with workplace procedures | ||||||||
Element: Corrective action is taken when response does not meet with documentation, water system plant integrity or personnel safety requirements | ||||||||
Element: Water system plant is returned to required operational status upon completion of testing, in accordance with workplace procedures | ||||||||
Element: Analyse water systemplant faults |
| |||||||
Element: Corrective action is taken, in accordance with workplace procedures | ||||||||
Element: Water system plant integrity and personnel safety is maintained, in accordance with workplace procedures, and in consultation with appropriate personnel and technical and operational documentation | ||||||||
Element: Monitor and inspect water systemplant |
| |||||||
Element: Water system plant is monitored and inspected, in accordance with workplace procedures, for normal operation or to detect deviations | ||||||||
Element: Appropriate personnel are notified when defects are detected, in accordance with workplace procedures | ||||||||
Element: Complete documentation |
| |||||||
Element: Documentation is updated, in accordance with workplace procedures |