Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UEPOPS333 Mapping and Delivery Guide
Operate and monitor HRSG hot gas control system

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEPOPS333 - Operate and monitor HRSG hot gas control system
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to operate, inspect and monitor Heat Recovery Steam Generator(HRSG) hot gas control systems.HRSGs are used to recover heat from a hot gasstreams which is then supplied to a steam turbine to generate additional electric power. The hot gas control system is used operate the internal gas returnand/or bypasssystem in the HRSG.Competency in this unit requires the ability to plan work, operate heat recovery steam generator plant, test heat recovery steam generator plant, analyse heat recovery steam generator plant faults, monitor and inspect heat recovery steam generator plant and complete all documentation. Individuals will, in general, work under supervision, in a power generation facility as an operator.Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Operations
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan and prepare work
  • Safety issues related to operating and monitoring Heat Recovery Steam Generator (HRSG) hot gas control system plant is identified, in accordance with workplace procedures and Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations and legislative requirements
  • Work requirements are identified, in accordance with workplace procedures, and from appropriate personnel and documentation
  • Documentation to determine HRSG hot gas control system plant status is assessed and evaluated, in accordance with workplace procedures
  • Inspection and field preparation for HRSG hot gas control system plant service is carried out, in accordance with workplace procedures and manufacturers' recommendations
  • HRSG hot gas control system plant operational prerequisites are established, in accordance with workplace procedures and manufacturers' recommendations
  • Sequence for recommissioning of HRSG hot gas control system plant is determined to suit existing circumstances, in accordance with workplace procedures and site requirements
       
Element: Work requirements are identified, in accordance with workplace procedures, and from appropriate personnel and documentation
       
Element: Documentation to determine HRSG hot gas control system plant status is assessed and evaluated, in accordance with workplace procedures
       
Element: Inspection and field preparation for HRSG hot gas control system plant service is carried out, in accordance with workplace procedures and manufacturers' recommendations
       
Element: HRSG hot gas control system plant operational prerequisites are established, in accordance with workplace procedures and manufacturers' recommendations
       
Element: Sequence for recommissioning of HRSG hot gas control system plant is determined to suit existing circumstances, in accordance with workplace procedures and site requirements
       
Element: Operate HRSG hot gas control systemplant
  • HRSG hot gas control system plant is operated, in accordance with workplace procedures and manufacturers' operating recommendations
       
Element: HRSG hot gas control system plant is monitored and observed, in accordance with workplace procedures, to detect deviations from normal operating conditions
       
Element: Corrective actions are taken to rectify HRSG hot gas control system plant abnormalities, in accordance with workplace procedures and manufacturers' recommendations
       
Element: Test HRSG hot gas control systemplant operation
  • Operational tests are performed, in accordance with workplace procedures
       
Element: HRSG hot gas control system plant is observed for correct operational response, in accordance with workplace procedures
       
Element: Corrective action is taken, in accordance with workplace procedures, when response, does not meet with documentation, HRSG hot gas control system plant integrity or personnel safety requirements
       
Element: HRSG hot gas control system plant is returned to required operational status upon completion of test, in accordance with workplace procedures
       
Element: Analyse HRSG hot gas control systemplant faults
  • Cause of abnormal HRSG hot gas control system plant operating conditions are identified, in accordance with workplace procedures, and by analysing technical and operational information
       
Element: Corrective action is taken, in accordance with workplace procedures
       
Element: HRSG hot gas control system plant integrity and personnel safety is maintained, in accordance with workplace procedures, and in consultation with appropriate personnel and technical and operational documentation
       
Element: Monitor and inspect HRSG hot gas control systemplant
  • HRSG hot gas control system plant to be monitored or inspected is physically identified, in accordance with workplace procedures
       
Element: HRSG hot gas control system plant is monitored or inspected, in accordance with workplace procedures, for normal operation or to detect deviations
       
Element: Complete documentation
  • HRSG hot gas control system plant problems, movements, abnormalities and status are reported, in accordance with workplace procedures
       
Element: Documentation is updated, in accordance with workplace procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Safety issues related to operating and monitoring Heat Recovery Steam Generator (HRSG) hot gas control system plant is identified, in accordance with workplace procedures and Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations and legislative requirements 
Work requirements are identified, in accordance with workplace procedures, and from appropriate personnel and documentation 
Documentation to determine HRSG hot gas control system plant status is assessed and evaluated, in accordance with workplace procedures 
Inspection and field preparation for HRSG hot gas control system plant service is carried out, in accordance with workplace procedures and manufacturers' recommendations 
HRSG hot gas control system plant operational prerequisites are established, in accordance with workplace procedures and manufacturers' recommendations 
Sequence for recommissioning of HRSG hot gas control system plant is determined to suit existing circumstances, in accordance with workplace procedures and site requirements 
 
 
 
 
 
HRSG hot gas control system plant is operated, in accordance with workplace procedures and manufacturers' operating recommendations 
 
 
Operational tests are performed, in accordance with workplace procedures 
 
 
 
Cause of abnormal HRSG hot gas control system plant operating conditions are identified, in accordance with workplace procedures, and by analysing technical and operational information 
 
 
HRSG hot gas control system plant to be monitored or inspected is physically identified, in accordance with workplace procedures 
 
HRSG hot gas control system plant problems, movements, abnormalities and status are reported, in accordance with workplace procedures 
 

Forms

Assessment Cover Sheet

UEPOPS333 - Operate and monitor HRSG hot gas control system
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEPOPS333 - Operate and monitor HRSG hot gas control system

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: