UEPOPS360 Mapping and Delivery Guide
Operate and monitor a hydro turbine
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEPOPS360 - Operate and monitor a hydro turbine |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to operate, inspect and monitor in-service hydro turbines. Turbines are a basic component in most methods of generating electricity in hydro generation power facilities.Competency in this unit requires the ability to plan work, operate hydro turbine plant, test hydro turbine plant, analyse hydro turbine plant faults, monitor and inspect hydro turbine plant and the completion of all documentation. Individuals will, in general, work under supervision, in a power generation facility as an operator. Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication. Note: Workplace practiceThe application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Operations |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan and prepare work |
| |||||||
Element: Work tasks and hydro turbine plant requirements are identified from appropriate personnel and documentation, in accordance with workplace procedures | ||||||||
Element: Hydro turbine run up and loading schedule are ascertained from relevant documentation, in accordance with workplace procedures and site requirements | ||||||||
Element: Inspection, preoperational tests and field preparations for hydro turbine plant service are carried out, in accordance with workplace procedures and manufacturers' recommendations | ||||||||
Element: Hydro turbine plant operational prerequisites are established, in accordance with workplace procedures and manufacturers' recommendations | ||||||||
Element: Sequence for recommissioning of hydro turbine plant is determined, in accordance with workplace procedures and site requirements | ||||||||
Element: Operate hydro turbineplant |
| |||||||
Element: Hydro turbine plant is operated within limits of its' design, in accordance with workplace procedures | ||||||||
Element: Hydro turbine plant is monitored and observed, in accordance with workplace procedures, to detect deviations from required operating conditions | ||||||||
Element: Corrective actions are taken to rectify hydro turbine abnormalities, in accordance with workplace procedures and manufacturers' recommendations | ||||||||
Element: Test hydro turbineplant operation |
| |||||||
Element: Hydro turbine plant is observed for correct operational response, in accordance with workplace procedures | ||||||||
Element: Corrective action is taken, in accordance with workplace procedures, when response does not meet with documentation, hydro turbine plant integrity or personnel safety requirements | ||||||||
Element: Hydro turbine plant is returned to required safe operational status upon completion of testing, in accordance with workplace procedures | ||||||||
Element: Analyse hydro turbineplant faults |
| |||||||
Element: Actions necessary to rectify faults are correctly determined, in accordance with workplace procedures | ||||||||
Element: Hydro turbine plant integrity and personnel safety is maintained, in accordance with workplace procedures, and in consultation with appropriate personnel and technical and operational documentation | ||||||||
Element: Monitor and inspect hydro turbineplant |
| |||||||
Element: Hydro turbine plant is monitored and inspected, in accordance with workplace procedures, for normal operation or to detect deviations | ||||||||
Element: Corrective action is taken, in accordance with workplace procedures | ||||||||
Element: Appropriate personnel are notified, in accordance with workplace procedures, when defects are detected | ||||||||
Element: Complete documentation |
| |||||||
Element: Documentation is updated, in accordance with workplace procedures |