Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEPOPS372 Mapping and Delivery Guide
Operate and monitor generator/alternator auxiliary plant
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEPOPS372 - Operate and monitor generator/alternator auxiliary plant |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to operate, inspect and monitor generator and/or alternator auxiliary plant, including stator water systems, hydrogen cooling systems, seal oil and lubricating oil systems.A power generation facility's auxiliary equipment and systems are designed to keep power generating plant operating smoothly in a variety of circumstances.Competency in this unit requires the ability to plan work, operate generator and/or alternator auxiliary plant, test generator and/or alternator auxiliary plant, analyse generator and/or alternator auxiliary plant faults, monitor and inspect generator and/or alternator auxiliary plant and the completion of all documentation. Individuals will, in general, work under supervision, in a power generation facility as an operator.Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Operations |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan and prepare work |
| |||||||
Element: Work requirements and generator and/or alternator auxiliary plant are identified from appropriate personnel and documentation, in accordance with workplace procedures | ||||||||
Element: Generator and/or alternator auxiliary running up and loading schedule is ascertained from relevant documentation, in accordance with workplace procedures and site requirements | ||||||||
Element: Inspection, preoperational tests and field preparations for generator and/or alternator auxiliary plant service are carried out, in accordance with workplace procedures and manufacturers' recommendations | ||||||||
Element: Generator and/or alternator auxiliary plant operational prerequisites are established, in accordance with workplace procedures and manufacturers' recommendations | ||||||||
Element: Sequence for recommissioning of generator and/or alternator auxiliary plant is determined, in accordance with workplace procedures and site requirements | ||||||||
Element: Operate generator/alternator auxiliaryplant |
| |||||||
Element: Generator and/or alternator auxiliary plant is monitored and observed, in accordance with workplace procedures, to detect deviations from required operating conditions | ||||||||
Element: Corrective actions are taken to rectify generator and/or alternator auxiliary plant abnormalities, in accordance with workplace procedures and manufacturers' recommendations | ||||||||
Element: Test generator/alternator auxiliaryplant operation |
| |||||||
Element: Generator and/or alternator auxiliary plant is observed for correct operational response, in accordance with workplace procedures | ||||||||
Element: Corrective action is taken, in accordance with workplace procedures, when response does not meet with documentation, generator or alternator auxiliary plant integrity or personnel safety requirements | ||||||||
Element: Generator and/or alternator auxiliary plant is returned to required operational status upon completion of testing, in accordance with workplace procedures | ||||||||
Element: Analyse generator/alternator auxiliaryplant faults |
| |||||||
Element: Corrective actions to rectify generator and/or alternator auxiliary plant faults are determined, in accordance with workplace procedures | ||||||||
Element: Generator and/or alternator auxiliary plant integrity and personnel safety is maintained, in accordance with workplace procedures, and in consultation with appropriate personnel and technical and operational documentation | ||||||||
Element: Monitor and inspect generator/alternator auxiliaryplant |
| |||||||
Element: Generator and/or alternator auxiliary plant is monitored and inspected, in accordance with workplace procedures, for normal operation or to detect deviations | ||||||||
Element: Corrective action is taken, in accordance with workplace procedures | ||||||||
Element: Appropriate personnel are notified, in accordance with workplace procedures, when defects are detected | ||||||||
Element: Complete documentation |
| |||||||
Element: Documentation is updated, in accordance with workplace procedures |