Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required for the purging, ignition and establishment of combustion and run-up of a gas turbine to operational and synchronous speed. A gas turbine may be operated as an individual unit on open cycle or as a component of a combined cycle plant consisting of a gas turbine, heat recovery steam generator and steam turbine. Competency in this unit requires the ability to plan and prepare work, conduct gas turbine start and run up, test gas turbine plant, identify and respond to gas turbine plant operation and complete documentation. Individuals will, in general, work under supervision, in a power generation facility as an operator. Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Operations
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan and prepare gas turbine start and run upwork
  • Safety issues are identified in accordance with workplace procedures, Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations and site requirements
       
Element: Work requirements are identified from appropriate personnel and documentation, in accordance with workplace procedures
       
Element: Preoperational checks are carried out on gas turbine plant, in accordance with manufacturers' recommendations and workplace procedures
       
Element: Conduct gas turbinestart and run up
  • Preoperational conditions for gas turbine plant are established, in accordance with workplace procedures and site requirements
       
Element: Preoperational conditions of the Heat Recovery Steam Generator (HRSG), associated steam mains and steam turbine are established when gas turbine is a component of a combined unit, in accordance with workplace procedures
       
Element: Starting procedures and correct purge, ignition and run-up sequence are commenced and observed, in accordance with workplace
       
Element: Minimum operation of gas turbine is established and supported, in accordance with workplace procedures and manufacturers' recommendations
       
Element: Monitoring and control of HRSG drum level, feedwater flow, steam and metal temperature rates of rise, steam pressure rate of rise, steam flow and drainage are carried out where gas turbine is a component of a combined cycle unit, in accordance with workplace procedures
       
Element: Gas turbine exhaust temperature and flow to HRSG and gas turbine power output are monitored and adjusted to achieve required steam conditions, in accordance with workplace procedures
       
Element: Generating plant is operated within limits of its' design, in accordance with workplace procedures
       
Element: Generating plant is monitored and observed, in accordance with workplace procedures, to detect deviations from required operating conditions
       
Element: Corrective action is taken to rectify gas turbine abnormalities, in accordance with manufacturers' recommendations and workplace procedures
       
Element: Test gas turbineplant operation
  • Tests are performed, in accordance with workplace procedures
       
Element: Power generation system and gas turbine plant is observed, in accordance with workplace procedures, for correct operational response
       
Element: Corrective action is taken, in accordance with workplace procedures, when response does not meet documentation, plant integrity or personnel safety requirements
       
Element: Gas turbine plant is returned to required operational status upon completion of testing, in accordance with workplace procedures
       
Element: Identify, respond and report on gas turbine plant operation and anomalies
  • Causes of abnormal gas turbine plant operating conditions are identified, in accordance with workplace procedures, by analysing technical and operational information
       
Element: Corrective action is taken, in accordance with workplace procedures
       
Element: Gas turbine plant integrity and personnel safety is maintained, in accordance with workplace procedures, through consultation with appropriate personnel and technical and operational documentation
       
Element: Appropriate personnel are notified, in accordance with workplace procedures, when defects are detected
       
Element: Complete documentation
  • Gas turbine plant problems, movements, and status reported, in accordance with workplace procedures
       
Element: Documentation is updated, in accordance with workplace procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Safety issues are identified in accordance with workplace procedures, Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations and site requirements 
 
 
Preoperational conditions for gas turbine plant are established, in accordance with workplace procedures and site requirements 
 
 
 
 
 
 
 
 
Tests are performed, in accordance with workplace procedures 
 
 
 
Causes of abnormal gas turbine plant operating conditions are identified, in accordance with workplace procedures, by analysing technical and operational information 
 
 
 
Gas turbine plant problems, movements, and status reported, in accordance with workplace procedures 
 

Forms

Assessment Cover Sheet

UEPOPS407 - Start and run up gas turbine
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEPOPS407 - Start and run up gas turbine

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature: