UEPOPS410 Mapping and Delivery Guide
Shut down a boiler unit
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEPOPS410 - Shut down a boiler unit |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to conduct the shutdown of a boiler unit to a depressurised state.A shut down of a boiler unit will involve a series of steps to stop production, feed and fuel flows in a safe and controlled manner.Competency in this unit requires the ability to plan and prepare boiler unit shut down, conduct a shut down, test boiler unit operation during shut down, analyse boiler unit system faults during shut down and completing documentation post shut down. Individuals will, in general, work under supervision in a power generation facility as an operator.Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Operations |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan and prepare boiler unit shut down work |
| |||||||
Element: Work requirements are identified from relevant personnel and documentation, in accordance with workplace procedures | ||||||||
Element: Preoperational checks are carried out on boiler unit plant in accordance with workplace procedures, manufacturers' recommendations and workplace procedures and site requirements | ||||||||
Element: Conduct boiler unit shut down |
| |||||||
Element: Cool down and purge boiler unit, in accordance with manufacturers' specifications and workplace procedures | ||||||||
Element: Depressurise boiler unit, in accordance with manufacturers' specifications and workplace procedures | ||||||||
Element: Corrective actions are taken to rectify boiler unit abnormalities, in accordance with manufacturers' recommendations and workplace procedures | ||||||||
Element: Test boiler unitplant operation |
| |||||||
Element: Power generation system and boiler unit plant is observed for correct operational response, in accordance with workplace procedures | ||||||||
Element: Corrective action is taken, in accordance with workplace procedures, when response does not meet with documentation, boiler unit plant integrity or personnel safety requirements | ||||||||
Element: Boiler unit plant is returned to required operational status upon completion of testing, in accordance with workplace procedures | ||||||||
Element: Analyse and report on system faults during boiler unit shut down |
| |||||||
Element: Corrective action is taken, in accordance with workplace procedures | ||||||||
Element: Boiler unit plant integrity and personnel safety is maintained, in accordance with workplace procedures, and through consultation with appropriate personnel, and technical and operational documentation | ||||||||
Element: Appropriate personnel are notified, in accordance with workplace procedures, when defects are detected | ||||||||
Element: Complete documentation |
| |||||||