Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEPOPS432 Mapping and Delivery Guide
Start up a heat recovery steam generator unit
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEPOPS432 - Start up a heat recovery steam generator unit |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to start up a Heat Recovery Steam Generator (HRSG) for service.HRSGs are recovery heat exchangers that retrieve the heat from hot gasstreams which are then supplied to steam turbines to generate additional electric power. Placing an HRSG in-service will require the entry of a heating medium and the control of water within the steam and/or water drum. It includes monitoring the flow and quality of feedwater, steam pressure and temperature increases and metal temperatures within HSRG design limits so that the HRSG is supplying a constant flow of steam at the required temperature and pressure.Competency in this unit requires the ability to plan and prepare start up, operate HRSG plant during start up, test and analyse HRSG system faults and complete documentation. Individuals will, in general, work under supervision, in a power generation facility as an operator.Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Operations |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Conduct HRSGstart up |
| |||||||
Element: Analyse HRSGfaults |
| |||||||
Element: Plan and prepareHRSG start upwork |
| |||||||
Element: Work requirements are identified from relevant personnel and documentation, in accordance with workplace procedures | ||||||||
Element: Preoperational checks are carried out on plant, in accordance with manufacturers' recommendations and workplace procedures and site requirements |
| |||||||
Element: Minimum operation of gas turbine is established and supported, in accordance with workplace procedures and manufacturers' specifications | ||||||||
Element: Monitoring of HRSG drum level, feedwater flow, steam and metal temperature rates of rise, steam pressure rate of rise and control of steam flow and drainage is carried out, in accordance with manufacturers' specifications and workplace procedures | ||||||||
Element: Exhaust temperature, flow to HRSG and gas turbine power output are adjusted, in accordance workplace procedures, to achieve required steam conditions and demand | ||||||||
Element: HRSG plant is operated within limits of its' design, in accordance with workplace procedures. | ||||||||
Element: HRSG plant is monitored, in accordance with workplace procedures, to detect deviations from required operating conditions | ||||||||
Element: Corrective action is taken to rectify HRSG abnormalities, in accordance with manufacturers' recommendations and workplace procedures | ||||||||
Element: Test HRSG plant operation |
| |||||||
Element: HRSG plant is observed, in accordance with workplace procedures, for correct operational response | ||||||||
Element: Corrective action is taken, in accordance with workplace procedures, when response does not meet documentation, plant integrity or personnel safety requirements | ||||||||
Element: HRSG plant is returned to required operational status upon completion of testing, in accordance with workplace procedures |
| |||||||
Element: Corrective action is taken, in accordance with workplace procedures | ||||||||
Element: HRSG plant integrity and personnel safety is maintained, in accordance with workplace procedures, and through consultation with appropriate personnel and technical and operational documentation | ||||||||
Element: Appropriate personnel are notified, in accordance with workplace procedures, when defects are detected | ||||||||
Element: Complete documentation |
| |||||||
Element: Documentation is updated, in accordance with workplace procedures |