Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEPOPS443 Mapping and Delivery Guide
Coordinate wind farm operations
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEPOPS443 - Coordinate wind farm operations |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to coordinate the safe management of energy production at a wind farm.Awind farmconsists of a group ofwind turbinesin the same location used to produce electricity. Turbines at a wind farm are typically interconnected, with a substation transformer used to send the power to its grid destination.Competency in this unit requires the ability to plan for plant operation, monitor wind farm operations, control wind farm electrical energy production, test wind farm operation,analyse system or plant faultsand the completion of all documentation. Individuals will, in general, work as an operator at a wind farm with responsibilities for coordination activities. Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Operations |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan for plant operation |
| |||||||
Element: Work and wind farm plant and resource requirements are identified, in accordance with workplace procedures, from relevant information and documentation | ||||||||
Element: Preoperational checks of wind farm plant and equipment are carried out, in accordance with workplace procedures | ||||||||
Element: Monitor wind farm operations |
| |||||||
Element: Alarms are acknowledged, prioritised and responded to, in accordance with workplace procedures | ||||||||
Element: Deviations from wind farm operations are identified and corrective actions are taken, in accordance with workplace procedures | ||||||||
Element: Wind farm plant and equipment use is monitored in key areas and trends in problems are identified, in accordance with workplace procedures | ||||||||
Element: Control wind farm electrical energy production |
| |||||||
Element: Wind turbines are manually adjusted to meet operation requirements, in accordance with workplace procedures and manufacturers' recommendations | ||||||||
Element: Wind turbines are taken out of service and are shut down to meet operational and maintenance requirements, in accordance with workplace procedures and manufacturers' recommendations | ||||||||
Element: Wind turbines are run-up and placed into service to meet operational requirements, in accordance with workplace procedures and manufacturers' recommendations | ||||||||
Element: Appropriate personnel are notified, in accordance with workplace procedures, when wind turbine defects and abnormal operating conditions are detected | ||||||||
Element: Test wind farm operation |
| |||||||
Element: Wind farm system and plant is observed for correct operational response, in accordance with workplace procedures | ||||||||
Element: Corrective action is taken, in accordance with workplace procedures, when response does not meet with documentation, wind farm plant and system integrity or personnel safety requirements | ||||||||
Element: Wind farm system and plant is returned to required operational status, in accordance with workplace procedures, upon completion of test | ||||||||
Element: Analyse wind farm system andplant faults |
| |||||||
Element: Corrective actions to rectify faults are determined, in accordance with workplace procedures | ||||||||
Element: Wind farm system and plant integrity and personnel safety are maintained, in accordance with workplace procedures, through consultation with personnel and technical and operational documentation | ||||||||
Element: Appropriate personnel, including specialists, are arranged, in accordance with workplace procedures, for investigation of identified operational wind farm abnormalities | ||||||||
Element: Complete documentation |
| |||||||
Element: Documentation is updated, in accordance with workplace procedures |